procedures used in the residential units. Cleaning of the HVAC systems and cleaning of carpets
presented the only significant differences from the procedures used to clean the residential units.
A discussion of the HVAC system logistics, cleaning of the HVAC systems, and cleaning of the
carpeting in the commercial units follows.
2.G.1 Cleaning of HVAC Systems
Commercial Unit Chiropractor’s Office is located in the north end of the building at the Liberty
Street address. Formerly a chiropractor’s office, it contains four cubicle spaces for patients and
an administrative section with a waiting room and a half bath facility. The air conditioning
system in the unit is suspended from the third floor deck above a suspended acoustical tiled
ceiling, located in the South end of the office space. It utilizes a common closed return to convey
air to the blower cabinet. The supply trunk runs northward, supplying air to the balance of the
rental space through supply diffuser grills. The system's condensing/compressor unit is located
on the building's atrium roof area at the second floor elevation.
Commercial Unit Retail Mattress Store is located in the north end of the building at the Liberty
Street address. Formerly a retail mattress show room for bedding, space design is open through
out, with a half bath, utility closet, and coat closet in the south end of the room. The A/C system
air handler is suspended under the third floor deck, above the suspended acoustical tiled ceiling.
The system has two closed return air grills, a blower cabinet, and a supply trunk with a four way
directional supply grill. The system's condensing/compressor unit is located in the building's
atrium roof area at the second floor area elevation.
The procedures used to clean Commercial Units Chiropractor’s Office and Retail Mattress Store
were identical and can be found in Attachment 11. They mirrored the procedures generally used
by HVAC cleaning companies to respond to ordinary HVAC cleaning requisitions. The
following cleaning activities were conducted, in the following order:
1. A clean plastic barrier was installed on the floor surface, three (3) feet to either side of the
suspended HVAC system, from the return intake to the furthest supply grill.
2. Access points were selected at the return and supply sides of the duct system. A
HEPA-filtered vacuum collection system was installed at the end of the supply run to
collect the internal dust.
3. A rotating brush system was used to dislodge dusts in the direction of the vacuum
collection system.
4. Degreasing agents were used on the HVAC internal coil units and cleaned. Supply grills
were cleaned in similar fashion.
5. A biocide agent was applied to the duct's internal components and allowed to dry.
6. An encapsulant was applied to the internal surfaces at the conclusion of the task to ensure
residual dust was sealed in.
7. The work area was cleaned of all equipment and plastic protection.
8. The system was visually inspected at the air handling unit access panels for view of
internal components. The ductwork was visually inspected in the return and in the supply
19