NYC 9/11 Public Portal Document
Store, Lemongrass Grill, and The Food Exchange. These systems were cleaned by
professional duct cleaning companies using standard cleaning procedures.
E. (Wet Wiping.) Wet wiping was accomplished using water only on horizontal and vertical
surfaces. This cleaning procedure was applied in the Chiropractor’s Office (bathroom tile
floor and desktop), the Mattress Store (vinyl tile floor and window ledge), and the Barber
Shop (vertical and horizontal surfaces).
Modified Scope A - Lower Manhattan Cleaning Procedure
Added as an amendment to the original work plan, this cleaning method mirrored the procedure
that EPA and NYC are implementing as part of the Indoor Air Residential Assistance-WTC Dust
Cleanup Program, with the exception of the cleaning of personal belongings. This procedure is
presented in Attachment F, Scope A - Lower Manhattcn Cleaning Procedure.
2.5 Mobilization
Site activities began on June 17, 2002. Activities included mobilizing equipment and supplies,
establishing a temporary office, identifying emergency support services and contacting vendors to
arrange for specialized services and delivery of bulk items. Consolidated Edison was contacted
and installed a shunt from the main trunk line to the building to provide electricity. Mobilization
was completed by June 21, 2002. On June 24, 2002, WRS laborers arrived at the study building
to begin work. Work continued through the third week of October 2002.
Prior to commencement of the study, bulk samples were collected fi'om three units in the building.
Samples were collected fi’om units that contained excessive amounts of dust, in an attempt to
characterize the asbestos concentration in dust fi'om worst case locations in the building. Samples
were collected fi'om the Chiropractor's Office, the Mattress Store and residential Unit 5C.
Analysis of the samples indicated that less than one percent asbestos was present. Therefore,
NYC asbestos licensing and certification regulations did not apply to the project. The federal
OSHA asbestos standard (29 CFR 1926.1101) did apply to the project. At EPA direction, WRS
assigned a team of asbestos-trained personnel to the project. Two licensed supervisors and two
licensed workers were part of the operations team. All field operations personnel had completed
all applicable training.
2.6 Cleaning of Residential Units
The cleaning of each of the thirteen residential units was accomplished using the vacuum
equipment type prescribed by the designated test, as presented in Attachment H, Synopsis of
Cleaning Methods by Building Area and Fact Sheets. Management of waste was accomplished
as the cleaning activities occurred. The sequence of procedures followed in each residential unit
was the same.
Security. The first cleaning activity in each unit related to the securing of potential access points
fi'om air infiltration, such as wall and window mounted air conditioning units. It was necessary to
clean the access points as they were secured, to ensure that use of the access points after cleaning
activities would not result in re-contamination. In order to limit unauthorized access to the
building and to protect equipment and supplies during daytime work hours, previously damaged
windows were secured and the entrance door to the building was continuously monitored. At the
17
NYC-WTC_000145715
OCR can misread numbers and units. Confirm readings against the page image before using them.