Cleaning Procedures IiK For Ta 114 l.ihertv Street area may be established. Work shall proceed from the 12*'’ floor down to the first floor. The use of a remote decontamination enclosure system is acceptable. Prior approval must be received from the NYCDEP for decontamination enclosure system placement and phasing of clean-up activities, if required.
(8) An entry/exit log in compliance with the requirements set forth in Title 15, Chapter 1 of the RCNY shall be maintained in the clean room. The site supervisor shall maintain an activity log.
(9) Initially, the interior of the elevator shaft, including the top of the elevator car and the elevator pit, shall be HEPA vacuumed and wet wiped to allow for the use of the elevator during the clean up. Once the clean up throughout the building is complete, the elevator shaft, including the top of the elevator car and the elevator pit, shall be re-cleaned prior to clearance air monitoring.
(10) Isolation barrier locations (i.e.: wall or ceiling penetrations, windows, vents, doors, etc.) shall be HEPA vacuumed and wet wiped prior to installing two-layers of 6-mil polyethylene sheeting and sealed with tape. Window wells, ledges, guards, etc., that are accessible from the interior shall be cleaned.
(11) Negative pressure ventilation equipment (air filtration devices -AFDs) shall be installed and operated continuously 24 hours per day during all clean-up activities. Equipment shall run continuously until clearance air monitoring. A minimum of one air change every 15 minutes shall be provided. When ducting to the outside is not possible, a second negative air unit compatible with the primary unit may be connected in series.
(12) Dropped ceilings at functional air plenums shall be removed. Interior and perimeter walls shall be removed to access the interstitial spaces for cleaning. Only one side of each wall shall be removed to access the space. The back of walls scheduled to remain (i.e. tiled bathroom walls) shall be wet wiped and HEPA-vacuumed. For specific information regarding the location of walls to be removed, please refer to the plans.
(13) The HVAC Systems and associated ductwork shall be removed and disposed in accordance with applicable rules and regulations.
(14) All debris and/or dust shall be misted and double bagged. Accumulation of water is prohibited. Water misting shall be sufficient to wet the material without water accumulations. Caution shall be taken to avoid wetting items that may be damaged by wet methods. An encapsulating agent shall not be applied. Fallen pieces of fireproofing shall be wetted and bagged directly.
(15) All surfaces shall be wet wiped and HEPA vacuumed. Once the initial cleaning is performed, and all surfaces are dry, a second cleaning shall be performed. Surfaces include but are not limited to walls, floors, ceilings, ledges, windowsills, trims, appliances, equipment, personal items, and furnishings. Fireproofing and insulation shall be HEPA-vacuumed only. Care shall be taken to minimize the disturbance of the fireproofing and insulation. The fireproofing is not ACM according to the information provided to the DEP.
(16) Surfaces that may not be wet wiped shall be HEPA vacuumed three times or disposed as ACM waste. Disposal of material may not occur without prior authorization by the building owner and/or resident, as applicable. Items identified by residents for cleaning that cannot be cleaned shall be
2 of 4
NYC-WTC_000162850
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
7 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗10 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000138892
Forwarding draft cleaning procedures for 114 Liberty Street to EPA for review and comments.
12 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155168
Draft cleaning procedures and contract documentation for 114 Liberty with minor revisions, shared with EPA for review and comment.
12 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107535
Resident request for DEP to perform cleaning and monitoring work at an apartment in Manhattan.
11 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107379
Formal request by a resident for the Department of Environmental Protection to perform cleaning and monitoring work at their apartment.
10 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107169
Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.
11 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107808
Permit application for asbestos abatement contractor to clean interiors of a building at 125 [name].
6 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100686
Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
8 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107407
Permit application detailing background debris conditions and requirements for licensed contractors to clean interior surfaces.
6 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 2 pages · confidence 0.15 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000138892
Forwarding draft cleaning procedures for 114 Liberty Street to EPA for review and comments.
Cited alongside this record in an Ask answer
NYC-WTC_000155168
Draft cleaning procedures and contract documentation for 114 Liberty with minor revisions, shared with EPA for review and comment.
Cited alongside this record in an Ask answer
NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
Cited alongside this record in an Ask answer
Header page of a DEP Asbestos Inspection Report submitted by ETS Construction for the 114 Liberty Street site.
Cited alongside this record in an Ask answer
NYC-WTC_000155109
Letter providing background on the proposed DEP cleaning of the damaged residential building located across from the WTC site.
Cited alongside this record in an Ask answer