NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 428 pages

EPA WTC interim report comments, 2003

Machine-extracted title · confidence 28%

Comments on EPA interim report regarding World Trade Center collapse from 2003.

NYC-WTC_000251148–000251575
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

G.- EPA’s 110 Liberty St. study, Deutsche Bank building - 121

fiberglass. Typically, this soap does not “over-suds". It provides an effective detergent­ based protection of surfaces when combined with cold water.

Cleaning Air Conditioning Units. ... [These were privately owned air conditioning units, in addition to the wall units that the landlord had removed and disposed] two types of air conditioning systems were used in the residential living spaces: window/wall mounted air conditioners, and ceiling-mounted ductless air conditioners with remote condenser/compressor units. Bathroom fans also presented airflow routes that needed to be cleaned. Ceiling-mounted air conditioners were cleaned using HEPA-filtered equipment. The grills were removed to provide access to the interior. The condenser and compressor units on the roof were visually inspected and found to be clean. Removal of the ceiling cover to access the bathroom fan assemblies was necessary. The fan and motor were vacuumed: the fan housing was wet wiped. The interior of the exhaust duct was vacuumed to the first foot. The unit was reassembled and covered with poly sheeting.

Baseboard heating components, including the hydronic finned radiation systems, were cleaned. The protective covers were removed to expose the heating elements. The fins were then vacuumed and brushed simultaneously to remove dust. The space located under the heating element was vacuumed. The protective covers were reattached.

Cleaning of Refrigerators, Dishwashers and Stoves (including exhaust fans). Prior to cleaning refrigerators, the appliance was unplugged and checked for food contents. If present, food was removed, bagged and disposed. The coils, underbody, compressor compartment, and back of each refrigerator was cleaned. Dust from the cooling coils was cleaned by elevating the appliance and simultaneously using vacuums and specialized brushes. Upon completing these activities the floor area where the refrigerator had been located was cleaned. Prior to cleaning, each stove unit was disconnected from its electric receptacle and gas line. Old exhaust fan lights and filters were removed and replaced. The first foot of the exhaust duct was vacuumed. The stove hood was vacuumed. Prior to cleaning dishwashers, the toe plate was removed and dust was vacuumed from under the appliance. After cleaning, all appliances were staged on plastic for subsequent removal by the owner, who had decided to replace them.

HVAC systems... were cleaned bv professional duct cleaning companies using standard cleaning procedures.... They mirrored the procedures used by HVAC cleaning companies when responding to ordinary HVAC cleaning requisitions. The following cleaning activities were conducted, in the following order:

1. A clean plastic barrier was installed on the floor surface, three feet to either side of the suspended HVAC system, from the return intake to the furthest supply grill. 2. Access points were selected at the return and supply sides of the duct system. A HEPA filtered vacuum collection system was installed at the end of the supply run to collect internal dust. 3. A rotating brush system was used to dislodge dust in the direction of the vacuum collection system. 4. Degreasing agents were used on the HVAC internal coil units and cleaned. Supply grills were cleaned in a similar fashion. 5. A biocide agent was applied to the duct's internal components and allowed to dry. 6. An encapsulant was applied to the internal surfaces in order to ensure that residual dust was sealed in. 7. The work area was cleaned of all equipment and plastic protection.

NYC-WTC_000251278

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251278Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →