the furthest point of the interior of the unit back to the door. Wet wiping was the last activity
performed within the unit.
Cleaning Air Conditioning Units. Two types of air conditioning systems supported the residential
living spaces within the building: Window/Wall Mounted Air Conditioners, and
Ceiling-Mounted Ductless Air Conditioners. Bathroom fans also presented airflow routes that
needed to be cleaned. Ceiling-Mounted Air Conditioners were cleaned using HEPA-filtered
equipment. The grills were removed to provide access to the interior. The condenser and
compressor units on the roof were visually inspected and found to be clean. Removal of the
ceiling cover to access the bathroom fan assemblies was necessary. The fan and motor were
vacuumed; the fan housing was wet-wiped. The interior of the exhaust duct was vacuumed to the
first foot. The unit was reassembled and covered with poly sheeting. Baseboard heating,
including the hydronic finned radiation systems were cleaned. The protective covers were
removed to expose the heating elements. The fins were then vacuumed and brushed
simultaneously to remove dust. The space located under the heating element was vacuumed and
the protective covers were reattached.
Vacuuming of Refiigerators, Dishwashers and Stoves (including exhaust fans). Prior to cleaning
refrigerators, the appliance was unplugged and checked for food contents. If present, food was
removed, bagged and disposed of. The coils, and underbody, compressor compartment and
back of each refrigerator was cleaned. Dust from the cooling coils was cleaned by elevating the
appliance and simultaneously using vacuums and specialized brushes. Upon completing these
activities the floor area where the refrigerator had been located was cleaned. Prior to cleaning
stoves, each stove unit was disconnected from its electric receptacle and gas line. Old exhaust
fan lights and filters were removed and replaced. The first foot of the exhaust duct was
vacuumed. The stove hood was vacuumed. Prior to cleaning, the toe plate from dishwashers,
and vacuumed dust from under the appliance. After cleaning, all appliances were staged on
plastic for subsequent removal by the owner, who had decided to replace them.
Pre-cleaning and Post-cleaning Sampling. Pre-cleaning and post-cleaning sampling was
performed to measure levels of COPCs. All sampling was conducted in accordance with the
Quality Action Project Plan (QAPP) contained within Attachment 10, Sampling and Analysis
Plan. Wipe samples were collected from solid surfaces, both vertical and horizontal. A micro
vacuum technique was used on sofas, mattresses, and porous materials. Sampling data was
reviewed and a decision regarding the need for additional cleaning was made.
2.G. Cleaning of Commercial and Common Areas (and Basement)
Two commercial units were included in the Study as presented in the Attachment 12, Synopsis of
Cleaning Methods by Building Areas. The cleaning of each commercial unit was accomplished
using the vacuum equipment type prescribed by the designated test. Management of waste was
accomplished as the cleaning activities occurred. The sequence of procedures for vacuuming, wet
wiping, waste management, and pre-cleaning and post-cleaning sampling mirrored the