NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 121 pages

COPCS report, NYC WTC chain of custody

Machine-extracted title · confidence 50%

Table of contents for contaminants of [name] report and building sections.

NYC-WTC_000276652–000276772
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

INTERNAL REVIEW DRAFT

Security. The first cleaning activity in each unit related to the securing of potential access points for air infiltration, such as wall and window mounted air conditioning units. It was necessary to clean the access points as they were secured, to ensure that use of the access points after cleaning activities would not result in recontamination. In order to limit unauthorized access to the building and to protect equipment and supplies during daytime work hours, previously damaged windows were secured and the access door to the building was continuously monitored. At the end of the work day, the entrance door on the Cedar Street side of the building was locked.

In windows where the glass had been blown out, the temporary wood panels that had installed for site security purposes were removed and reinstalled to afford complete closure. Intact windows were opened, and the jambs, sashes, and sills were cleaned thoroughly. The windows were then closed. In windows where an air conditioning unit was present, the air conditioning unit was removed from the window. The temporary protection on the exterior of the window was removed. The window cabinet that had housed the air conditioning unit was vacuumed, then covered with plastic to prevent air filtration. The air conditioning unit was vacuumed to remove loose dust, wrapped in plastic, and disposed. Wall mounted air conditioning units were removed from the wall, and sealed in plastic. The. wall cabinet that had housed the air conditioning unit was vacuumed, then covered with plastic to prevent air infiltration. The air conditioning unit was vacuumed to remove loose dust, wrapped in plastic, and disposed. Disposal of the air conditioning units and installation of new self-contained ductless systems was performed by the building owner.

Waste Management. At project onset, due to limited space outside the building, it was necessary to line the hallways with plastic and temporarily locate the items to be disposed, including personal possessions, until a roll-off container could be procured. As cleaning progressed, waste was accumulated and staged in the common areas by the elevator until a sufficient quantity was gathered to fill a roll-off container. The waste was wrapped in plastic to avoid cross contamination of the hallways leading to the roll-off container. The removed materials were hand-carried through the hallways and down the stairwell to the roll-off container located outdoors, because the elevator was not functioning. Additional details regarding disposal are in Disposal of Debris, Attachment 9.

Vacuuming. Vacuuming commenced at the entrance doorway of the unit. Working from the ceiling to the floor, toward the furthest area of the unit, all surfaces were vacuumed of loose dust and debris. Walls, ceilings, doors, pipes, ledges, closets, cabinets, shelving, trim, fixtures, and electrical outlets were vacuumed as they were encountered. Upon reaching the furthest point in the unit, the direction of cleaning was reversed and the same cleaning procedures were followed while returning to the point of origin at the entrance doorway. This accomplished the cleaning of each unit twice using the designated cleaning method.

Wet Wiping. Wet wiping was performed on all horizontal surfaces to remove dust. The cleaning crew applied wet wiping to all horizontal surfaces, including the floor, as they progressed from

17

CITY_21MC100_004204974

NYC-WTC_000276670

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000276670Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000243565

EIA report for Law Department project at 100 Church Street by TRC.

Similar indexed content

Compare copies and versions →