Commercial Unit 1 was wet vacuumed using hot water. Commercial Unit 2: was wet
vacuumed using hot water and carpet shampoo.
D. (HVAC cleaning) HVAC systems are located in Unit 1: Chiropractor's Office, Unit 2;
Retail Mattress Showroom, Unit 4: Thai Restaurant and Unit 5: The Food Exchange.
These systems were cleaned by professional duct cleaning companies using standard
cleaning procedures.
E. (Wet Wiping) Use of water only for wet wipe of horizontal and vertical surfaces.
Cleaning using this procedure was applied to Commercial Unit 1; Chiropractor Office
(bathroom tile floor and desk top) Retail Mattress Showroom (vinyl tile floor and window
ledge) Commercial Unit 6: The Barber Shop (vertical and horizontal surfaces)
Scope A - Lower Manhattan Cleaning Procedure
This method mirrored the procedure that EPA and the City of New York are implementing as
part of the Indoor Air Residential Assistance - WTC Dust Cleanup Program. A description of
Scope A is presented in Attachment 8.
2.F. Mobilization and Cleaning Sequence
2.F.I. Mobilization
Site activities began of June 17, 2002. Activities included the mobilization of equipment and
supplies, establishing a temporary office, the identification of emergency support services and
contacting vendors to arrange for specialized services as well as delivery and shipment of bulk
items. Consolidated Edison was contacted to install a shunt from the main trunk line to the
building to provide electricity. Mobilization was completed by June 21, 2002. On June 24, 2002,
WRS laborers and Weston sampling personnel arrived at the Study building to begin work.
Work continued through the third week of October 2002.
Prior to the start of the Study bulk samples were collected from three units in the building.
Samples were collected from units that contained excessive amounts of dust in an attempt to
characterize the asbestos concentration in dust from worst case locations in the building Samples
were collected from Commercial Unit 1: the Chiropractor's Office, Commercial Unit 2: the Retail
Mattress Showroom and residential Unit 5C. Analysis of the samples indicated that less than 1%
asbestos was present. Therefore, NYC asbestos licensing and certification regulations did not
apply to the project. Federal OSHA asbestos standard (29 CFR 1926.1101) did apply to the
project. At EPA direction, WRS assigned a team of asbestos trained personnel to the project.
Two licensed supervisors and two licensed workers were part of the operations team. All field
operations personnel had completed all applicable training.
2.F.2. Cleaning Sequence
Each of the thirteen residential units were cleaned according to the designated test of cleaning
methods, as presented in the flowing section. The cleaning of each residential unit was
accomplished using the vacuum equipment type prescribed by the designated test. Management
of waste was accomplished as the cleaning activities occurred. The sequence of procedures
followed in each residential unit was the same.