NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 02/21/09
Floor iZip Borough Block Lot Squad # Badge #
Various_________ 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze_____ F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:35 am to 10:05 am
I arrived at the premise at 8:35 am, proceeded to the decon, signed the log book, don the appropriate level of
personal protective equipment to enter the regulated area on 4"'floor. Negative air pressure was 0.033.
One person was present for the decon maintenance.
4'*’ Floor - 13 workers were present at the work area, cleaning the platforms at the shaft area, re-sealing the
critical barriers, fine cleaning the floor, using HEPA vacuum, covering the holes, repairing the cage of electrical
bulb. 4 Gaylord boxes were wrapped and sprayed ready for load out. Inspection was done on micro trap
machines and tents.
After following the decontamination procedure I signed the log book and used south hoist to proceed
to the 3'" floor.
S"* Floor - 25 workers were present on the floor. Workers on scissor lifts at the south extended area were
removing insulation and taking down air ducts; cutting metal fixtures at the south side decon, removing air ducts
and cutting into the pieces at the south/east side of the floor, setting up high visibility fencing around the shaft
area, wrapping beams with poly, preparing boxes. 12 Gaylord boxes were ready for load out. Inspection was
done on micro trap machines and tents.
I used B stairwell to proceed to the 2"'^ floor.
2"'' Floor - 43 workers were found inside the work place, demolishing the brick wall at the south/east side of
the floor, spraying around the area with amended water, picking up debris, demolishing the air ducts at the
various locations, cutting metal using tools attached to the HEPA vacuum, cutting and removing pipes from the
ceiling, two workers on scissor lift at the east side work area were cutting metal from the ceiling; others
spraying the area with amended water, wrapping beams with poly, preparing boxes. 18 Gaylord boxes were on
the floor sealed, sprayed and ready for load out.
I used B stairwell to proceed to the V floor.
T" Floor - 49 workers on the floor were demolishing sheetrock wall and spraying with amended water, taking
down drop ceiling, clearing the shafts from debris, placing into the boxes and spraying with water, cutting ducts ,
at the various locations, cutting metal into the pieces, preparing, wrapping and loading out boxes through the
waste decon. A large amount of debris and poly wrapped beams exists on the floor. 30 Gaylord boxes were on
the floor ready to be taken out. Inspection was done on micro trap machines and tents.
I used B stairwell to go back to the 3"^oor.
After following the decontamination, procedure I signed the log book and used south hoist to return to the
ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Riclimond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131217
NYC-WTC_000266060