Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 07/20/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor's Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 973-772-3660
Third Party Air Monitor Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York______ One Uberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 212-221-7822 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:15 am to 9:30 am
I arrived at the premise at 8:15 am. LVI schedule informed that activities include: exterior fagade removal, prep.
North exterior column tents on 3'“ floor; abate columns at West Atrium on 2"‘’floor; break down work area on V
floor; demo ducts and conduits, scrape fireproofing, box out debris in basement.
I proceeded to the west site decon, signed the log book, don the appropriate level of personal protective
equipment to enter the regulated area in the basement. Two Workers were present for the decon maintenance,
cleaning the clean room and organizing shower room.
Negative air pressure on the floor was -0.016.
Basement - 35 Asbestos Handlers were present inside the work area. Workers inside the electrical room #2
and pump room were cutting and removing conduits, using power tools with HEPA vacuum attached. At the
extended area of electrical room #1 workers were moving the scissor lifts and equipment to prepare the area
for fireproofing removal. Inside the pump room at the end of the hallway workers were demolishing 1 wythe
brick to open the cinder wall, spraying the area with amended water. I observed that there was excessive water
inside the electrical room #1 from the ceiling cleaning. Handler Supervisor Geraldo was advised to collect and
dispose the water accumulation properly, and workers immediately performed the cleaning. Other workers were
placing debris into the boxes; preparing and loading out boxes through the waste decon. 20 Gaylord boxes
were on the floor ready for load out. Inspection was done on micro trap machines and tents.
After following the decontamination procedure I exited the work area.
Using the stairs on the west side of the building I proceeded to the V* floor.
V' Floor - No activities or personnel observed on the floor. Using stairs I went to the 2"'^floor.
2"'’ Floor - Column at West Atrium was abated and 9 workers were suit up ready to enter the containment. 11
Gaylord boxes were on the floor ready for load out.
Using stairs I proceeded to the 3'^floor.
3'“ Floor - 12 Eagle scaffolding workers were erecting the scaffold and setting up platforms for fagade work at
the east side of the building. At the north/west side area one tent was set up around the column and 9 workers
were prepping second North exterior column tent. At the south side building crew was removing glass windows.
10 Gaylord boxes were on the floor ready to be taken down to the ground floor.
Using west side stairs I returned to the ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattaii 2=Bronx 3=Brooklyn 4=Queens S-Riclimond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000130988
NYC-WTC_000266046