NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection, 130 Liberty Street, Jul 2009

Machine-extracted title · confidence 43%

Asbestos inspection record for 130 Liberty Street with contractor details and photos.

NYC-WTC_000266046
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 07/20/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor's Name Sample Number LVI Environmental Address City Sample Number 462 Getty Avenue Clifton State Zip Phone Sample Number NJ 07011 973-772-3660 Third Party Air Monitor Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York______ One Uberty Plaza New York State Zip Phone State Zip Phone NY 10018 212-221-7822 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:15 am to 9:30 am

I arrived at the premise at 8:15 am. LVI schedule informed that activities include: exterior fagade removal, prep. North exterior column tents on 3'“ floor; abate columns at West Atrium on 2"‘’floor; break down work area on V floor; demo ducts and conduits, scrape fireproofing, box out debris in basement.

I proceeded to the west site decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area in the basement. Two Workers were present for the decon maintenance, cleaning the clean room and organizing shower room. Negative air pressure on the floor was -0.016.

Basement - 35 Asbestos Handlers were present inside the work area. Workers inside the electrical room #2 and pump room were cutting and removing conduits, using power tools with HEPA vacuum attached. At the extended area of electrical room #1 workers were moving the scissor lifts and equipment to prepare the area for fireproofing removal. Inside the pump room at the end of the hallway workers were demolishing 1 wythe brick to open the cinder wall, spraying the area with amended water. I observed that there was excessive water inside the electrical room #1 from the ceiling cleaning. Handler Supervisor Geraldo was advised to collect and dispose the water accumulation properly, and workers immediately performed the cleaning. Other workers were placing debris into the boxes; preparing and loading out boxes through the waste decon. 20 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. After following the decontamination procedure I exited the work area. Using the stairs on the west side of the building I proceeded to the V* floor.

V' Floor - No activities or personnel observed on the floor. Using stairs I went to the 2"'^floor.

2"'’ Floor - Column at West Atrium was abated and 9 workers were suit up ready to enter the containment. 11 Gaylord boxes were on the floor ready for load out. Using stairs I proceeded to the 3'^floor.

3'“ Floor - 12 Eagle scaffolding workers were erecting the scaffold and setting up platforms for fagade work at the east side of the building. At the north/west side area one tent was set up around the column and 9 workers were prepping second North exterior column tent. At the south side building crew was removing glass windows. 10 Gaylord boxes were on the floor ready to be taken down to the ground floor. Using west side stairs I returned to the ground floor.

Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattaii 2=Bronx 3=Brooklyn 4=Queens S-Riclimond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130988

NYC-WTC_000266046

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266046Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →