NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection at 130 Liberty Street, Mar 2009

Machine-extracted title · confidence 25%

LMDC site asbestos inspection with contractor and sample data.

NYC-WTC_000265945
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/24/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:40 am to 9:50 am

I arrived at the premise at 8:40 am. LVI schedule informed that activities include: scrape fireproofing, clear off floor on S'^floor, clear off floor, scrape fireproofing, erect platforms various locations on 2'"' floor, clear floor, cut ducts, demo walls, ceilings on V floor. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 3'‘^lDor. One worker was present for the decon maintenance, cleaning and organizing the clean room. Negative air pressure on the floor was -0.038.

3'" Floor - I observed 36 workers on the floor in the process of scraping fireproofing and washing beams and columns at the areas 11 and 12, cleaning the platforms of the scaffolds, picking up debris from the floor, placing into the boxes. Other workers were preparing boxes. 8 open Gaylord boxes were on the floor. 20 Micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 2"'' floor.

2"'' Floor - 55 workers were found inside the work area. Workers inside the shaft west 2 were cutting pipes and filling up the holes with foam. Two workers inside the shaft west 3 were on scissor lifts scraping the ceiling, spraying with amended water. Workers on scaffolds were removing fireproofing at the areas 11 and 12 washing and cleaning the beams and columns, sweeping floor. At the high ceiling vestibule workers in scissor lift were breaking down the glass partition, lowering the lift to bring the broken parts to the floor level. Two other workers in scissor lift were covering the holes of the critical barrier with foam on all perimeter of the east side work area. Other workers were sweeping the floor using equipment equipped with HEPA filters, preparing and loading out boxes. 10 Gaylord boxes were on the floor sealed, sprayed and ready for load out, 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 1®'floor.

1’' Floor - 68 workers were on the floor. Eagle scaffolding workers were erecting platforms inside the east shaft and mechanical room. Workers in scissor lifts were cutting pipes and filling with foam at the various locations. Workers on scissor lifts were removing insulation and cutting air ducts; cutting and demolishing metal partition; clearing off two shafts, placing debris into the boxes and spraying with amended water; cutting metal at the various locations into the pieces, wrapping beams, preparing and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 15 Gaylord boxes were on the floor readyTor load out. Inspection was done on micro trap machines and tents.

I observed: 1. First (inside) layer exhaust duct of one of the micro trap machines was damaged and detached. 2. Poly of the wrapped beam was observed damaged while ready for load out. Foreman on the floor was advised, and he directed workers to repair the exhaust duct and re-tape the poly of the beam. I used B stairwell to proceed to the S'” floor. After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailers.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV # Infraction Infraction Infraction Supervisor^^^l^al

Borough l=Manhanan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code ] = Violation Issued 2=>Jo Violation Issued 3=^0 300655 4=Projecl not started {no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130781

NYC-WTC_000265945

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265945Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →