NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection, 130 Liberty Street, May 20 2009

Machine-extracted title · confidence 66%

Asbestos inspection record for 130 Liberty Street; photos taken; LMDC.

NYC-WTC_000265933
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 05/20/09 Floor Zip Borough Block Lot Squad # Badge # Various 1 B 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 no Contractor’s Name Sample Number LVI Environmental Address City Sample Number 462 Getty Avenue Clifton State Zip Phone Sample Number NJ 07011 973-772-3660 Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:55 pm to 2:45 pm

I arrived at the premise at 1:55 pm. LVI schedule informed that activities include: scraping Atrium area on 2"" floor, clear floor, cut ducts, pipes, scrape fireproofing South East side, TRC/ATC visual. Eagle scaffolding - erect platforms in various shafts, loading out boxes to ATC trailer on 1" floor.

I proceeded to the decon on O'^floor, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area. One worker was present for the decon maintenance. Negative air pressure of the area was -0.031. I used the C stairwell to proceed to the 2"“^ floor.

2"" Floor - 16 Asbestos Handlers were present inside the work area. Workers on scaffolds were scraping the fireproofing at the area 10 - Atrium Area, washing scaffolds and equipment, spraying the fireproofing with amended water; workers on the floor cleaning the floor using equipment equipped with HEPA filters, placing debris into the boxes. At the north/west side of the work area workers were inside the west #2 shaft cutting sir ducts and conduits, lifting pieces down, spraying the area with amended water. Others were preparing and loading out boxes. 10 sealed Gaylord boxes were on the floor, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used the stairs to proceed to the 1®* floor.

V* Floor - 64 workers were on the floor. Workers at the south/west side vestibule were cutting and removing the metal panels from the 1®’, 2"^ and 3^^ vertical beams to open the areas for fireproofing removal. On the south side mezzanine workers were breaking the blocks, spraying with amended water, placing debris into the boxes. Workers on mezzanine at the south side were scraping the area 4, spraying with amended water, cleaning the floor, picking up debris using metal shovels; scraping the ceilings, beams and columns from fireproofing at the area 1 - south side, cleaning the floor from debris, placing into the boxes. Workers inside the west#2 shaft were clearing off the floor from debris and spraying with water. Others were cutting metal into the pieces and spraying with amended water inside the former computer room; cutting conduits and placing on carts; wrapping beams with poly, preparing and loading out boxes through the north side waste decon. 15 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial ------------------ Z— Borough 1=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Riclimond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No accessi 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130744

NYC-WTC_000265933

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265933Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →