Asbestos abatement/cleanup, building observations

Machine-extracted title · confidence 34%

Table of contents for asbestos abatement cleanup and air monitoring observations.

NYC-WTC_000251595–000251602
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

flci'Oil el'ScilledDuil Clfuniip Wi>rk PrpceiiuKsMbiJiciiienr Supiior/ Sti icts. ?<;.?■ .H./l.v, i.A WFnvfct .Vo. 20!JO-2-1221 O/lArr J...-::,cn .:a. .:l)l<2

LAW’S work obscrvuiion efforts include.

I. Overview of the Contractor’s mobilization of mulerial.s and equipoKni to the wi r.v.sitc.

Inspection of work area containment efforts to verify that the work ares lia; been ■>

adequately contained prior to initiation of Contiactor’s asbosios-abaiemcnt effoits;

Periodic obvervalions of the Contiactor’s asbestos abatement efforts to verify their adequacy and completeness: 4. Periodic observations and inspections of the Contractor’s work area eontainme.nt enclosure sy.stein to verify that barriers and seals remain intact, and that signiljca,ii breeches do not occur which go unrecognized without prompt adequate mpair effons;

Periodic monitoring the Contractor’s control and prevention of tin Authorized and improperly trained or equipped persons from entering the work site;

6. Appropriate observations and visual inspections during work area clean up .u d decontamination efforts; 7. Performance of final visual inspection of the work areas to verify that Jie sittleil dust cleaning effons have been performed consistent with specified procedure;., uni approv il to proceed with clearance air monitoring efforts;

8. Observing removal of asbestos-containing waste materials from the build ng;

9. Reque.st for all manifests, trip tickets, and landfill receipts to doctiriier.t hat disposal of asbft,stos-containing materials took place in approved wa.stc disposal site, ;tnd taking such other reasonable procedures appropriate to document dispuvul j i an approved asbestos landfill;

10. Request from the Contractor, copies of all notifications, licenses, csniricates, vouchers, chain of custody .sheets and/or manifests, required to evidence comp ian::;; (or noncompliancp) with current legal requirements.

LAW'S work does not include;

1. Supervi.sion, direction, or control over Contractor’s work, nor doss L.A'W have authority over or respon.sihility for the means, methods, techniques, sequences, oi pn.vteduies of construction selected by the Contractor;

Responsibility for safety precautions and programs incidental to the work of ths Contractor nr for any failure of the Contractor to comply with law.., rul rs, regulations, ordinances, codes, or orders applicable to the Contractor fumi.shing and perfe-rning his work;

3. Right to stop the work of the Contractor, except in the event of ooservaticn of a.n imminent hazard of eoniaminaiion of an adjacent non-work area space, in which rase st may be done on behalf of the Owner as Consultant.

23 Air Monitoring / Work Area Clearance Testing

During the course of the emergency response abatemeni efforts, LAW will provide ecperienced zLr Monitoring Technicians on-site to provide appropriate air monitoring services, The Air Monitoring

Pugf f 0007

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_013309710

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000251598

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251598Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →