WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

3.2 Construction Coordination

Currently, four prime contractors, each with a number of subcontractors, are performing work at WTC and are working in relatively separated areas.

The ability of each of these contractors to work efficiently is directly affected by: safety concerns for the protection of the workers and others on site; engineering concerns for existing utilities and transit facilities; The ongoing recovery effort by emergency personnel.

As work progresses, the contractors’ work areas are moving closer and closer to one another’s. The continuing success of the clean-up efforts will depend on coordinating this work with all concerned parties and making the most efficient use of all available resources.

The type of coordination needed on-site requires skilled construction engineers and superintendents experienced in this type of work with an appreciation of the need to balance the interests of a range of different parties. Bechtel understands these requirements and can draw upon a large organization to meet this challenge.

The key construction coordination activities that Bechtel will perform are;

- Coordinate the efforts of emergency personnel with the contractor’s work ■ Work with the ES&H personnel in seeing that all work is performed safely and that all safety concerns are immediately addressed • Advise contractors of unsafe conditions and have the authority to stop work, if necessary, until the condition is remedied and safety is restored ■ Enhance communication between adjacent contractors to ensure work is performed in a safe and timely manner and that there is no duplication of efforts ■ Provide inspection in the field to make certain that all work is performed in accordance with approved work plans ■ Serve as an interface in the field between the contractors and other entities doing work including ConEdandNYCT ■ Make sure that an efficient communications link exists between the engineers and contractors ■ The construction coordination effort should extend beyond monitoring the work in the field to provide a resource to the contractors to generate innovative approaches to continuously improve the productivity of the clean-up efforts. Bechtel engineers and superintendents bring a vast amount of experience in similar work that can be shared with each of the contractors to ensure that the work progresses efficiently.

This experience can be put to use as follows:

■ Making sure that the right equipment is being used for each work task ■ Reviewing the contractor’s means and methods ensuring that they are the most efficient for the work at hand

Page 7 of 14

CITY_21 MCI 00_014587504

NYC-WTC_000243380

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243380Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →