NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

■ Assisting the contractor in making sure that resources are allocated to provide for the greatest efficiency ■ Construction coordination performed by a group of experienced people can provide the DDC with a safe and smoother running project by increasing commimication among all parties in the field and improving overall productivity and attention to project requirements.

3.3 Logistics

The Bechtel Management Team will develop a comprehensive logistics plan for the WTC clean-up effort that will optimize the amount and type of trucks, utilize the most effective haul routes, determine the appropriate resources for the transfer stations and monitor the truck tarping and washing operations.

It is important to recognize that the WTC clean-up effort is a material-handling project. Recognizing that the project site will continue to be compressed as more and more of lower Manhattan is opened to both pedestrian and vehicular traffic, the logistics of moving debris efficiently from the site to the various transfer stations becomes more and more critical. This means having the right types of trucks in sufficient quantities, direct trucking routes and adequate resources at the transfer stations. The work at the site is fluid and, as such, the logistics must be managed on a shift-to-shift basis.

It is important that each contractor have an adequate number and the right type of trucks at all times. During the early phase of this effort, all types of truck were welcomed. Now, contractors need to be required to use only those trucks that support the maximum production. It is also important that a field professional allocate the resources of DOS and DOT to complement those of the contractors to ensure that there are enough trucks for each contractor during any given shift.

Trucking routes are also critical to debris removal production. These routes must be kept open and free of other traffic as much as possible. Vehicles from other agencies need to be kept to a minimum. In addition, each contractor needs to establish and maintain storage yards as close to the work site as possible for both materials and equipment so as not to block the truck routes. Parking of private vehicles in the work site should also be prohibited. Each contractor must address this by alternative means.

The transfer stations must be managed to make sure that they keep pace with the material being hauled to them. Field personnel must be able to quickly communicate any problem at a transfer station through the construction coordinators in the field to each of the contractors in order to minimize delays. Proper scheduling will also indicate the amount of material being generated as the project s and will facilitate the adjustment of transfer station resources as necessary.

Impacts of material hauling on the surrounding communities must continue to be studied. The types of trucks used must be reviewed to make sure that the impact to the streets and subsurface utilities are minimized. Truck washing and tarping efforts are essential to maintain clean haul routes. There is a need to ensure that there are adequate washing and tarping stations operational at all times to make certain that this effort does not slow down the process.

Page 8 of 14

CITY_21 MCI 00_014587505

NYC-WTC_000243381

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243381Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →