WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

3.4 Engineering Management

The role of engineering management is to manage the engineering efforts that support the ongoing clean-up and debris removal effort. The Bechtel engineering manager will interface with the engineering departments of the affected utilities and public agencies and manage the efforts of additional engineering firms.

Currently, Thomton-Tomasetti and Mueser Rutledge are providing engineering assessments of the structures damaged by the WTC collapse and are developing structural support plans to protect the WTC slurry walls and other building foundations that were damaged. These efforts must be completed on time to support the ongoing debris removal effort. Contractor drawings will be reviewed to verify that work can be performed safely and that contractor activities will not affect the integrity of existing structures or reconstructed facilities.

The engineering manager will also interface with the engineering departments of the PANYNJ, NYCT, and DOT to facilitate the transfer of information needed to allow for the safe placement of cranes and equipment over and adjacent to existing infrastructure.

3.5 Infrastructure and Utility Coordination

The collapse of the WTC affected much of the public and private utilities and transportation infrastructure in the WTC area. The clean-up and the debris removal must be performed with the close coordination with the affected utility companies and the NYCT and PANYNJ. The debris removal must be performed while maintaining the integrity of the existing utilities and underground transportation facilities and the work must be scheduled to permit concurrent or sequential reconstruction of the damaged infrastructure. Bechtel will coordinate the activities of the utility companies with the recovery and clean-up work.

During development of the construction and schedule, discussions will be held with the various affected utilities, infrastructure and transit agencies. Their plans for reconstruction and repair will be included in the project master schedule. Bechtel recommends that an interagency task force be established and chaired by the DDC. The interagency task force would be the forum for communication among the affected agencies and the DDC project management team. The agencies would be requested to assign full-time representatives to this task force. Each interagency task force representative would be empowered to represent the interests of their respective agency and facilitate requests for information reviews and approvals from the parent agency. Bechtel will be responsible for monitoring and reporting on action items to ensure that actions are implemented in a timely manner. This task force will also resolve any conflicts that may arise.

3.6 Project Controis

The clean-up of the WTC site is a complex undertaking and involves the efforts of multiple public agencies, private and public utilities companies, and contractors. The work activities of these various project participants need to be planned, scheduled, and coordinated to permit work to be performed in a timely and efficient manner. The status of the work needs to be monitored and reported in order for the project management team to make the appropriate management decisions. This requires the

Page 9 of 14

CITY_21 MCI 00_014587506

NYC-WTC_000243382

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243382Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →