WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

implementation of a project management system of integrated information reporting, monitoring, and controls systems. Bechtel utilizes systems that have been developed, refined, and time-tested on projects similar to the scope, magnitude and complexity of the WTC clean-up effort.

The objectives of project controls management include:

■ Providing flexibility to manage changes impacting cost and schedule - Publishing accurate and timely information on project status as a basis for decision-making ■ Maintaining accountability through effective communication and coordination ■ Completing the projects and overall program within schedule and cost goals ■ Identify opportunities and difficulties to DDC early enough to facilitate measured and competent responses ■ The coordination of contractors’ work with work of the city, state and federal agencies that are involved in the WTC site clean-up and the rebuilding of damaged infrastructure - Accurate reporting of the work status to elected public officials and the public

At the outset, Bechtel schedulers, in conjunction with the construction coordination team and the construction contractors, will develop a project work plan and a well-conceived, realistic schedule and budget for the identified scope. This will identify: what must be done, when, by whom, in what order, and at what cost. This baseline will then be used to monitor future activities and identify potential deviations, allowing for early initiation of corrective action to avoid schedule delays and budget overruns.

Monitoring and controls systems provide:

■ A work breakdown structure (WBS) that subdivides work elements to facilitate presentation, evaluation, and review ■ A baseline plan and budget for execution of the program keyed to the work breakdown structure « A system that facilitates continuous measurement of performance against a baseline ■ A reporting system that identifies deviations fi-om the plan ■ A common source of information to ensure a consistent basis for reporting and evaluation

These systems help generate progress reports for individual areas as well as for the project as a whole, which the team submits to the DDC at regular intervals. Using these systems, the DDC will maintain a high degree of control over cost and schedule.

Working jointly with the DDC, Bechtel will establish a detailed budget for the clean-up of the WTC site. The budget will be separated into definable elements of work so that the actual cost can be tracked and compared against the budget as work progresses. Bechtel understands the need to budget and track cost by definable elements to satisfy the requirements of federal, city, and state agencies and insurers that will share in the cost of the clean-up and restoration of existing

Page 10 of 14

CITY_21 MCI 00_014587507

NYC-WTC_000243383

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243383Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 136

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.930 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →