NYC-WTC_000330742
Monitoring contractor requirements for on-site asbestos air sampling and clearance measurements.
16 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Chain-of-custody outlining debris removal and interior cleaning by abatement contractor.
NYC-WTC_000348491–000348495OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Project Monitoring
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.
2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.
3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 ho urs of telephone call.
4. A final report shall be submitted to the DEP within days of project completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.
5 of 5
CITY_21MC100_003011331
NYC-WTC_000348495
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000330742
Monitoring contractor requirements for on-site asbestos air sampling and clearance measurements.
16 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000206792
Contract scope defining requirements for licensed abatement contractors to clean debris and monitor asbestos air sampling at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000220321
DEP Bureau document defining scope for environmental sampling and asbestos air monitoring during interior cleaning at 125 Cedar Street.
16 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281926
Proposed on-site asbestos cleaning oversight and air monitoring requirements.
16 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281921
Contractor and monitoring requirements for asbestos cleaning at 125 Cedar Street.
16 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000252321
Chain of custody/SC for 125 Cedar Street cleaning and asbestos monitoring scope.
16 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441311
Scope of work for asbestos sampling and air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445849
New York DEP scope-of-work document for 125 Cedar Street remediation.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434571
Duplicate scope of work for interior cleaning and asbestos monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441728
Scope of work for asbestos abatement monitoring and clearance sampling.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434544
Scope of work for interior cleaning and asbestos monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153557
Document defining the scope for a monitoring contractor to oversee cleaning and conduct air sampling for various contaminants.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000281921
Contractor and monitoring requirements for asbestos cleaning at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000330742
Monitoring contractor requirements for on-site asbestos air sampling and clearance measurements.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281926
Proposed on-site asbestos cleaning oversight and air monitoring requirements.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000220321
DEP Bureau document defining scope for environmental sampling and asbestos air monitoring during interior cleaning at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000206792
Contract scope defining requirements for licensed abatement contractors to clean debris and monitor asbestos air sampling at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163372
Request to send the air monitoring scope document to legal counsel and the sender due to computer access issues.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000330742
Monitoring contractor requirements for on-site asbestos air sampling and clearance measurements.
Similar indexed content
NYC-WTC_000206792
Contract scope defining requirements for licensed abatement contractors to clean debris and monitor asbestos air sampling at 125 Cedar Street.
Similar indexed content
NYC-WTC_000220321
DEP Bureau document defining scope for environmental sampling and asbestos air monitoring during interior cleaning at 125 Cedar Street.
Similar indexed content
NYC-WTC_000153557
Document defining the scope for a monitoring contractor to oversee cleaning and conduct air sampling for various contaminants.
Similar indexed content
NYC-WTC_000281926
Proposed on-site asbestos cleaning oversight and air monitoring requirements.
Similar indexed content