6.0 SAMPLING FREQUENCY 6.1 Background
The background ambient air sampling period will consist of two weeks (14 consecutive calendar days) of monitoring performed immediately prior to the start of abatement activities. Samples will be collected using all seven (7) stations in the monitoring network. All target parameters will be collected over a 24-hour integrated period with the exception of asbestos, PM 10 and mercury utilizing the Lumex insti-ument. PM 10 will be monitored continuously at each of the seven (7) sites while asbestos measurements will be taken at a frequency of once per every eight (8) to twelve (12) hours at each of the sites.
6.2 Phase I - Asbestos and COPC Abatement Phase
During Phase I (abatement phase) air monitoring will take place at all seven (7) stations each day. During the first three (3) days only of Phase I work, samples will be collected for semivolatile organics to include PCDDs/PCDFs, PAHs and PCBs. After this first three (3) day period, samples for semivolatile organics will be reduced to a single location per week employing the seven (7) station network. More specifically, samples will not be collected using all seven (7) stations each day; rather a single set of samples will be collected each day at a single station in the network. This sequence will be repeated each day using a different station each day until all of the seven (7) stations have been used. In this manner a set of samples will be collected at each location every seven (7) days. The schedule will be repeated until project completion.
The semivolatile organic samples collected employing this weekly sampling frequency will not be processed for analyses; rather they will be placed in archival storage at the laboratory. A single set of samples will be selected from each sample set representing seven (7) days to undergo analyses for PCDDs/PCDFs, PAHs and PCBs. The station with the highest 24-hour average PM 10 concentration (ug/m3) recorded with a collocated organic sample each week will be selected for semivolatile organic analyses.
A summary of sampling frequencies on a target parameter specific basis applicable to the abatement phase of the deconstruction program is provided in Table 3.
Table 3. Phase I -Abatement Phase Sampling and Analysis Summary Location Parameter(s) Sample Frequency Analysis Method Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation Ground/Street 1. Asbestos Each Day, asbestos is 1. TEM Eevel 2. Silica sampled each work shift 2. XRD (4 T.ocations) 3. Metals 3. XRF
4. PCDDs/PCDEs Each Day (24 hr. Basis) 4. TO 9 A (HRGC/HRMs) 5. PAHs 5. TO 13 A (GC/MS) 6. PCBs 6. TO 4 A (GC/MS)
L2005-149 (051205) 1 5023623.2
C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000114896
NYC-WTC_000232265
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
19 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗9 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗9 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
9 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155430
Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
9 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
34 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗10 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156050
Document tracking the chain of custody for environmental samples collected at 114 Liberty Street on August 22, 2002.
10 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
19 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗9 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.980 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.958 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.957 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 1 Liberty Plaza · 1 pages · confidence 0.00 · verify page 1
- 120 Greenwich Street · 1 pages · confidence 0.00 · verify page 8
- 4 Albany Street · 1 pages · confidence 0.70 · verify page 22
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
Similar indexed content
Similar indexed content
Similar indexed content
NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
Similar indexed content