NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 33 pages

NYC-WTC_000232249

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000232249–000232281
Page image
Scanned page image, NYC-WTC_000232266
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Table 3. Phase I -Abatement Phase Sampling and Analysis Summary Location Parameter(s) Sample Frequency Analysis Method 7. PMIO Continuously “Real-Time” 7. EBAM 8. Mercury (vapor/gas) Each Day 8. lodatedCarbon Trap/CVAF Roof Top 1. Asbestos Each Day 1. TEM (3 Locations) 2. Silica Each Day (24 hr. Basis) 2. XRD 3. Metals 3. XRF 4. PCDDs/PCDFs 4. TO 9 A (HRGCZHRMS) 5. PAHs 5. TO 13 A (GC/MS) 6. PCBs 6. TO 4 A (GC/MS)

7. PMtO Continuously “Real-Time” 7. EBAM 8. Mercury (vapor/gas) Each Day 8. lodated Carbon Trap/CVAF

6.3 Phase II - Structural Deconstruction

During Phase II of the deconstruction project, air monitoring will take place at all seven (7) stations each day. During the first three (3) days only of Phase II, samples will be collected for semi-volatile organics to include PCDDs/PCDFs, PAHs and PCBs. After this first three (3) day period, samples for these organic parameters will be reduced to a single location per week frequency employing the seven (7) station network. More specifically, samples will not be collected using all seven (7) stations each day; rather a single set of samples will be collected each day at a single station in the network. This sequence will be repeated each day using a different station each day until all of the seven (7) stations have been used. In this manner a set of samples will be collected at each location every seven (7) days.The schedule will be repeated until project completion.

The semivolatile organic samples collected employing this weekly sampling frequency will not be processed for analyses; rather they will be placed in archival storage at the laboratory. A single set of samples will be selected from each sample set representing seven (7) days to undergo analyses for PCDDs/PCDFs, PAHs and PCBs. This sample set will be selected after consideration of the PM 10 data corresponding to the sites and days where organic samples were collected. The station with the highest 24-hour average PM 10 concentration (ug/m3) recorded with a collocated organic sample each week will be selected for analyses.

A summary of sampling frequencies on a target parameter specific basis applicable to the demolition phase of the deconstruction program is provided in Table 4.

Table 4, Phase II - Structural Deconstruction Phase Sampling and Analysis Summary Location Parameter(s) Sample Frequency Analysis Method Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Dav Visual observation

L2005-149 (051205) 2 5023623.2

C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000114897

NYC-WTC_000232266

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000232266Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000149798 · Box DEP Box 10

Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.

Similar indexed content

Compare copies and versions →