Section 2 - Ambient Air Monitoring Program Revision No.: 0 130 Liberty Street Deconstruction Plan Date: September 7, 2005 Lower Manhattan Development Corporation
Table 4. Phase I: Preparation Phase & Asbestos and COPC Abatement and Removal Sampling and Analysis Summary Location Parameter(s) Sample Frequency Analysis Method Off-Site Roof Top 1. Asbestos Each Day (asbestos and 1. TEM/SEM and Scaffolding 2. Silica silica are sampled during 2. XRD (4 locations on off work shift) site roof tops and 4 3. Metals Each Day (24 hr. Basis) 3. ICP/MS locations on 4. PCDDs/PCDFs 4. HRGC/HRMS scaffolding)* 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodated Caibon Trap/CVAFS 8. PM,o Continuously “Real-Time” 8. EB AM/Gravimetric 9. PM2.5 Each Day (PMio and PM2 5 9. EB AM/Gravimetric on 24 hour basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis witli location changed monthly)
* - If Phase I Asbestos and COPC Abatement proceeds below the scaffold monitors, then additional air monitoring for metals utilizing NIOSH Methods will be conducted at the exhaust manifolds on the lowest elevation of the work area grouping.
6.4 Phase II - Structural Deconstruction
During Phase II of the deconstruction project, air monitoring will take place at twelve (12) stations each day (Table 1 Locations 1-12). During the first three (3) days only of Phase 11, samples will be collected and analyzed for semi-volatile organics to include PCDDs/PCDFs, PAHs and PCBs. After this first three (3) day period, sampling for semivolatile organics will be reduced to a once per week frequency employing the entire station network. One day per week on a rotating basis (week #1 Monday, week #2 Tuesday, etc.) samples will be collected at eveiy station in the network. The schedule will be repeated until project completion.
The semivolatile organic samples collected employing this weekly sampling frequency will not be processed for analyses; rather they will be placed in archival storage at the laboratory. A single set of samples will be selected from each weekly sampling event to undergo analyses for PCDDs/PCDFs, PAHs and PCBs. This sample set will be selected after consideration of the PMio data corresponding to the sites and days where organic samples were collected. The station with the highest 24-hour average PMio concentration (ug/m3) recorded with a collocated organic sample each week will be selected for analyses.
A summary of sampling frequencies on a target parameter specific basis applicable to Phase II (deconstruction phase) of the deconstruction program is provided in Table 5.
6-5
CITY_DEP_WORBY_CANNATA_SUBP_000057088
NYC-WTC_000231998
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
26 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
33 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
8 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150109
Department of Environmental Protection report detailing ambient outdoor air monitoring for asbestos fibers.
4 shared non-person entities · 1 shared topics · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155430
Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
8 shared non-person entities · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095766
Part II of a permit application dated January 10, 2006 for air monitoring during remediation at 30 West Street.
24 shared non-person entities · 1 shared topics · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096676
Part III of an air monitoring plan for remediation and deconstruction at 30 Warren Street in January 2006.
24 shared non-person entities · 1 shared topics · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗10 shared non-person entities · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160471
Report on decontamination instructions for contractors and air clearance monitoring near Ground Zero at Battery Park City.
6 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162838
Correspondence regarding Schedule A forms and a draft scope of work for cleaning and air monitoring contracts at the site.
9 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.960 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.958 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 1 Liberty Plaza · 1 pages · confidence 0.15 · verify page 1
- 110 Greenwich Street · 1 pages · confidence 0.15 · verify page 10
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similar indexed content
Similar indexed content
NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
Similar indexed content
Department of Environmental Protection report detailing ambient outdoor air monitoring for asbestos fibers.
Similar indexed content