NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 38 pages

NYC-WTC_000232127

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000232127–000232164
Page image
Scanned page image, NYC-WTC_000232161
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 - Rev 2 September 16, 2005

Appendix A

Measurement Quality Objectives for PM 10 and PM2.5 - [Ref. Quality Assurance Handbook for Air Pollution Measurement Systems, Volume 11: Part 1, Appendix No: 3,1

Table A-1 - Measurement Quality Objectives - Parameter PM2.5 Requirement Frequency Acceptance Criteria 40 CFR Reference Filter Holding Times all filters < 30 days before sampling Part 50, .App.L Pre-sampling < 10 days at 25 oC Post-sampling weighing < 30 days at 4oC

Sampling Period All data 1380-1500 minutes Part 50, App.L Sec 3.3 or value if < 1380 and exceedance of NAAQS

Reporting Units All data g/ma Part 50.3

Detection Limit 2 g/tna Part 50, .App.L Sec 3.1 Lower DL .All data 200 g/ma Part 50, .App.L Sec 3.2 Upper Cone. Limit .All data

Filter Visual defect check All Filters Filter Conditioning Part 50, App.L Sec 6.0 Environment All Filters 4 hours minimum Equilibration 20-23 C Temp. Range +/-2‘’ C over 24 hr “ " Part 50, App.L Sec 8.2 Temp. Control 30% - 40% RH Humidity Range +/- 5% RH over 24 hr. Humidity Control Lot Blanks 3 filters per lot less than 15 g Lab QC Checks Field Filter Blank +30 g change between Part 50, .App.L Sec 8.2 Lab Filter Blank 3 per weighing session weighings Balance Check beginning, every 10th +15 g change between samples, Sec. 7.9 weighings end <3g Duplicate Filter Weighing I per sample batch + 15 g change between weighings

Calibration/Verification Flow Rate (FR) Calibration If multi-point failure ± 2% of transfer standard ± Part 50, .App.L, Sec 9.2 FR multi-point verification 1/yr 2% of transfer standard ± Part 50, .App.L, Sec 9.2.5 One point FR verification 1/4 weeks 4% of transfer standard 80 External Leak Check every 5 sampling events mL/min Part 50, .App.L, Sec 7.4 Internal Leak Check every 5 sampling events 80 mL/min Part 50, .App.L, Sec 7.4 Temperature Calibration If multi-point failure + 2% of standard Part 50, .App.L, Sec 9.3 Temp multi-point verification on installation, tlien 1/yr ± 2 of standard Part 50, .App.L, Sec 9.3 One- point temp Verification 1/4 weeks ± 4E of standard Part 50, .App.L, Sec 9.3 Pressure Calibration on installation, then 1/yr 1/4 +10 mm Hg Part 50, .App.L, Sec 9.3 Pressure Verification weeks ±10 mm Hg Part 50, .App.L, Sec 9.3 Clock/timer Verification 1/4 weeks 1 min/mo Part 50, .App.L, Sec 7.4

Accuracy FRM performance evaluation 1 ± 10% Part 58, .App A, Sec 3.5 Flow Rate Audit l/2wk (automated) ± 4% of audit standard

35

CITY_DEP_WORBY_CANNATA_SUBP_000087280

NYC-WTC_000232161

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000232161Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →