EPA review letter, 133-135 Greenwich Street

Machine-extracted title · confidence 90%

US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.

NYC-WTC_000134132–000134414
Page image
Scanned page image, NYC-WTC_000134264
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701— Rev 2 September 16, 2005

Appendix A

Measurement Quality Objectives for PM10 and PM2.5 — [Ref Quality Assurance Handbook for Air Pollution Measurement Systems, Volume II: Part 1, Appendix No: 3,]

Table A-1 - Measurement Quality Objectives - Parameter PM2.5 Requirement Frequency Acceptance Criteria 40 CFR Reference Filter Holding Times all filters < 30 days before sampling Part 50, App.L Pre-sampling < 10 days at 25 o C Post-sampling weighing < 30 days at 4oC

Sampling Period All data 1380-1500 minutes Part 50, App.L Sec 3.3 or value if < 1380 and exceedance of NAAQS

Reporting Units All data g/nu Part 50.3

Detection Limit 2 g/m3 Part S0, App.L Sec 3.1 Lower DL All data 200 g/m3 Part 50, App.L Sec 3.2 Upper Cone. Limit All data

Filter Visual defect check All Filters Filter Conditioning Part 50, App.L Sec 6.0 Environment All Filters 4 hours minimum Equilibration " 20-23 C Temp. Range " +/-2° C over 24 hr"" Part 50, App.L Sec 8.2 Temp. Control " 30% - 40% RH Humidity Range +1-5% RH over 24 hr. Humidity Control Lot Blanks 3 filters per lot less than 15 g " Lab QC Checks Field Filter Blank ±30 g change between Part 50, App.L Sec 8.2 Lab Filter Blank 3 per weighing session weighings Balance Check beginning, every 10th ±15 g change between samples, Sec. 7.9 weighings end <3g Duplicate Filter Weighing I per sample batch ±15 g change between weighings

Calibration/Verifcation Flow Rate (FR) Calibration If multi-point failure f 2% of transfer standard f Part 50, App.L, Sec 9.2 FR multi-point verification 1/yr 2% of transfer standard f Part 50, App.L, Sec 9.2.5 One point FR verification 1/4 weeks 4% of transfer standard 80 External Leak Check every 5 sampling events mL/min Part 50, App.L, Sec 7.4 Internal Leak Check every 5 sampling events 80 mL/min Part 50, App.L, Sec 7.4 Temperature Calibration If multi-point failure f 2% of standard Part 50, App.L, Sec 9.3 Temp multi-point verification on installation, then I/yr f 2 of standard Part 50, App.L, Sec 9.3 One- point temp Verification 1/4 weeks f 4E of standard Part 50, App.L, Sec 9.3 Pressure Calibration on installation, then 1/yr 1/4 ±10 mm Hg Part 50, App.L, Sec 9.3 Pressure Verification weeks ±10 mm Hg Part 50, App.L, Sec 9.3 Clock/timer Verification 1/ 4 weeks 1 min/mo Part 50, App.L, Sec 7.4

Accuracy FRM performance evaluation 1 ±10% Part 58, App A, Sec 3.5 Flow Rate Audit 1/2wk (automated) f 4% of audit standard

35

NYC-WTC 000134264

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134264Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →