NYC 9/11 Public Portal Document
NEW YORK CITY BOARD OF EDUCATION 90/100 TRINITY PLACE INVOICES
as of June 4, 2002
Contractor Billina I.D. Amount SCQPe
Submitted to Date Albert Kung 1 $ 9,616.00 90 panels analysis Albert Kung "2 $ 8,923.20 90 panels and bridging analysis ATC Associates, Inc._________ $ 182,768.60 90 air monitoring/analysis through 2/02 ATC Associates, Inc. 2 $ 87,215.20 10O air monitoring/analysis through 2/02 Athenica 118 $ 7,472.00 100 QC air monitoring Athenica ______________ ri9 $ 3,844.00 90 QC air monitoring AWL Industries. Inc._________ _______________ 16 $ 111,553.23 100 HVAC rehab AWL Industries, Inc._________ 17 $ 95,929.86 90 HVAC rehab Board of Education Custodian ____________ PO-1 A 268,604.28 90/100 custodial labor/cleaning Burns and Roe 2, 3, 4, 5, 6 $ 31,248.56 90 and 100 Trinity HVAC engineering Business Relocation Services 12452 $ 4,583.57 100 move-in Business Relocation Services 12454 $ 5,833.03 90 move-in Business Relocation Services __________ 23252 $ 5.079.11 100 move-in Corinthian 1149 $ 49,000.00 100 air shaft return cleaning/reinsutation Corinthian _____________ 1150 $ 2,867.23 100 secondary cleaning lower aud. roof Doriel Scaffolding____________ ______________ 107 $ 4,500.00 90 plywood wall to close sidewalk for probes DSP (work order) 00024666-03 $ 114,53 10O control valves hot water system DSF (work order) 00024866-04 $ 509.63 100 chill water valve DSF (work order)____________ QQQ52472-01 $ 1,719.21 100 public address system DSF (work order)____________ 73613 $ 2,112.35 __________ 100 plumbing in 12th floor bathroom DSF (work order)____________ 00090363-01 $ 7,000.00 _____________________ 90/100 plumbing repairs DSF (work order) 00092514-08 $ 3,291.58 90/100 glass in walkway DSF (work order) 00093067-01 $ 1,919.64 100 locks DSF (work order) 00093074-01 $ 13,144.32 100 locks, doors, door checks DSF (work order) 00093195-01 $ 4,932.29 100 door glass / metal sash windows DSF (work order)____________ 00093200-01 $ 1,690,19 90 glass main entrance doors DSF (work order) 00093200-03 $ 1,571.01 ___________ 90 doors, wood floor in gymnasium DSF (work order) 00093200-04 $ 4,619.47 90 fire hatch at stairway DSF (work order) 00093322-01 $ 518.83 90 interior glazing DSF (work order) 00093322-02 $ 1,432.21 90 door checks replacement DSF (work order) 00093322-03 $ 12.24 _____________________________ 90 repair locks DSF (work order for Simplex) 00101279-01 25,647.90 100 repair fire alarm system Kiss Construction 19 514,561.23 90 interior cleaning Kiss Construction____________ 29 $ 1,084,328,82 100 interior cleaning KW Tech 03-1001/#1 $ 32,610.00 100 ductwork insulation replacement KW Tech 03-1001/#2 5,078.00 100 additional ductwork insulation L. Naro_______________ _________ 0Q17J-O0 A 18,187.41 90 glass in lobby National Environmental Safety 3704-2001-#1 s 198,691.00 90 exterior cleaning National Environmental Safety 3705-2001-#1 $ 204,800.00 100 exterior cleaning National Environmental Safety 3705-2001-#2 $ 51,200.00 100 exterior cleaning National Environmental Safety 3704/5-2001-#1 $ 28,175.00 90/100 sidewalk bridging National Environmental Safety 3704/5-2001-#2 $ 10,225.00 90/100 sidewalk bridging National Environmental Safety 3704/5-2001-#1R $ 1,481.22 90/100 sidewalk bridging 18-day rental Safway Steel Products D0055356 $ 82,252.50 90 sidewalk bridge (for panels) (75% billed) Stance Electric______________ 2041 $ 1,031.58 90 bridge lighting Stance Electric 2049 $ 717.16 100 troubleshoot exhaust fans 9th floor Stance Electric 2060 $ 1,116.40 _________ 10Q troubleshoot fan shutdown relays Stance Electric 2073 s 632.45 100 bridge lighting Stance Electric 2074 $ 903.96 100 br. Itg. trouble-shoot breaker & remedy Stance Electric 2089 s 596.52 90 bridge lighting Stance Electric 2099 $ 847.82 100 bridge lighting Stance Electric 2128 $ 608.18 90 bridge lighting Stance Electric 2137 s 471.02 100 bridge lighting emergency response Taylor Environmental $ 129 30.928.00 90 air sampling Taylor Environmental________ $ 132 32,465.00 100 air sampling Taytor Environmental 139 $ 43,873.00 100 air sampling 149, 167, 176,182, 90/100 CM services TDX 199, 207, 226 $ 197,943.25 (fee, general conditions, personnel) Trio Asbestos 22 $ 666.946.07 100 interior clean-up Urban D.C. Inc. 6681 $ 227,983.25 _________________ 90 panels repair (21 panels) V&R Mechanical 1 $ 420,000.00 100 HVAC duct cleaning V&R Mechanical 8 (Change order) $ 1,500.00 ___________ 1QQ damaged ductwork at 6lh floor V&R Mechanical 18 (change order) $ 966.00 100 fresh air intake grille coverings/filters V&R Mechanical 19 (change order) 1 5,049.00 100 clean mixing boxes after new dampers V&R Mechanical 20 (change order) $ 1,530.00 too clean mixing boxes (plenums' 100 rectean floors 3,5,7,9,10, basement: inspect V&R Mechanical 56 (change order) $ 205,710.00 ____________________ HVAC entire building: etc. V&R Mechanical 11561 $ 308,000.00 90 HVAC duct cleaning V&R Mechanical 1 (change orders) $ 16.250.00 90 clean mech. room/replace metal flex Warren & Panzer Engineering 138 $ 3,950.00 asbestos monitoring @ 90 Trinity
TOTAL J 5,445,882.11
Forthcomino festimated amounts} Safway Steel Products S 27,417.50 90 sidewalk bridge (for panels) (25% unbilled) ATC Associates, Inc. $ 1,190.335.00 90 / 1QQ air monitoring/analysis 3/02 - 6/02
TOTAL $ 1,217,802.50
GRAND TOTAL I I $ 6,653,684.61 |
CITY_21MC100_009279708
NYC-WTC_000205269
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
2 shared non-person entities · 1 shared topics · similarity 0.870
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · similarity 0.865
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · similarity 0.864
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · similarity 0.864
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000171286
Document dated April 12, 2002 listing approved costs for various construction items including wall relocation and hurricane wall work at the Mayor's Office of Emergency Management.
1 shared topics · similarity 0.862
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173949
Financial breakdown of approved change orders for the Mayor's Office of Emergency Management, including costs for ductwork and electrical changes.
1 shared topics · similarity 0.859
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171620
Document listing approved costs and budget adjustments for various construction tasks at the Mayor's Office of Emergency Management.
1 shared topics · similarity 0.857
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172947
Document dated July 12, 1999 listing approved change orders and costs for construction work at the Mayor's Office of Emergency Management in 7 World Trade Center.
1 shared topics · similarity 0.853
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150969
Contract excerpt defining regulatory compliance requirements and describing visual assessments of debris on building exteriors near the World Trade Center.
1 shared non-person entities · similarity 0.852
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151189
Weekly progress summary as of February 14, 2003 tracking completed and ongoing cleaning and testing work across four quadrants (A-D).
1 shared non-person entities · 1 shared topics · similarity 0.851
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141870
Form document with significant degradation or scanning quality issues making content indecipherable.
1 shared non-person entities · 1 shared topics · similarity 0.850
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.931 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.929 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.928 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171286
Document dated April 12, 2002 listing approved costs for various construction items including wall relocation and hurricane wall work at the Mayor's Office of Emergency Management.
Similarity score 0.928 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.927 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Similar indexed content
Similar indexed content
Similar indexed content
Similar indexed content