NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET Expires April 30, 2001

PAPERWORK BURDEN DISCLOSURE NOTICE , Public reporting burden for this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing and submitting the forms. You are not required to respond to this collection of information unless a valid 0MB control number is displayed in the upper right corner of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: Information Collection Management, Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472, Paperwork Reduction Project (3067-0151). NOTE: Do not send your completed form to this address. DECLARATION NO; PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY 33 061-51000-33 01/05/02 E DAMAGE FACILITY WORK COMPLETE AS OF: Interior Cleaning 09/21/01 100 % APPLICANT COUNTY New York City Housing Preservation and Development New York LOCATION LATITUDE LONGITUDE 100 Gold Street, New York, NY 10038 DAMAGE DESCRIPTION AND DIMENSIONS The collapse of the World Trade Center (WTC) on September 11, 2001 caused a massive cloud of pulverized concrete and dust to impact neighboring buildings, blocks away from the the World Trade Center complex. The building of New York City's, Housing Preservation and Development (HPD) is located at 100 Gold Street, approximately four blocks away.

Dust entered the ventilation system of the building through louvers and exhaust vents. The ventilation system carried this dust and pulverized debris throughout the building. In addition, the lobby of 100 Gold Street was also used as a relief center to provide equipment, food, shelter, change of clothes, and supplies for displaced citizens and rescue personnel working at the WTC site. Dust and debris was carried into 100 Gold Street by the displaced citizens and rescue personnel that were covered in dust and pulverized debris. Because of the nature of the disaster, custodial services were necessary to rnaintain cleanliness of the facility.

SCOPE OF WORK Work complete consists of the clean up of the interior of 100 Gold Street while the relief center was open. This work was condui by additional labor provided by Perfect Building Maintenance Corporation and Consolidated Maintenance Systems Inc. (PBM/CMSI). PBM/CMSI had a contractual agreement with Newmark (who has a contractual agreement with HPD to provide building maintenance at 100 Gold Street) to perform work related to the clean up of the building.

PBM/CMSI provided labor and equipment to perform clean up of the building while the on-site relief center was open. Clean up of the basement, lobby, and each floor was conducted by 12 different laborers from September IT. 2001 until September 23, 2001. Air monitoring and analysis was not done in conjunction to this work. Clean up of this building consisted of janitorial services to remove pulverized dust and debris that entered the building from the WTC disaster and to clean up from debris and dust tracked in from rescue personnel and displaced citizens throughout the building. Total costs of contractual services to PBM/CMSI for this project total $20,941165

See Narrative for additional information Does the Scope of Work change the pre-disaster condition at site? □ Yes eg No Special Consideration issues included? [X] Yes □ No Hazard Mitigation proposal included? □ Yes [TCI No Is there insurance coverage on facility? E Yes □ No PROJECT COST ITEM CODE NARRATIVE QUANTITY/UNIT UNIT PRICE COST 1 9025 Contract - PBM/CMSI 1 / LS , $ 20,941.65 $ 20,941,65

; Total $ 20,941.65 I PREPARED BY: Dan Martin REMARKS: Project Officer FEMA Form 90-91, SEP 98

CITY_21MC100_010313121

NYC-WTC_000188179

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000188179Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →