NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/20/09
Floor Zip Borough Block Lot Squad # Badge #
Various_________ 10006 1 54 1 1 AO61
Inspector Building Type Basis of Inspection Photos Taken
H. Guirguis A TRU2068MN08 Yes
Contractor's Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp,
Address City Address City
1430 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr./TRC Environmental 08:00am - 10:00am
On arrival I met Nugent Gerald, Supervisor for LVI Environmental at the LVI field office, who informed me that a
total of 1 Handler Supervisor and 50 Asbestos Handlers were in the 3'“ floor today.
The daily work schedule informed me of the following.
1. 3"* floor: 50 men-scrape fireproofing, clear off floor
2. 2'’" floor: 54 men- seal critical, clear off floor. Eagle-14 men erect platforms various locations
3. l” floor: 76 men-clear floor, cut ducts, demo walls, ceilings, etc.
4. Various floors : 14 men loading out boxes to ATC trailer
I went to the decontamination enclosure system in the first floor at the west side After signing the log book
donned personal protection and accessed the work areas, I used stair B to go to from Y'floor to 3''^ floor.
V'& 2"“ floor: workers were found in the process of removing and wrapping debris; there was still a lot of
wet debris on the floor, demo walls, demolition was not completed, workers were cutting metal ducts and
electrical conduits into small pieces using power tools, HEPA vacuum attached with the power tools,
disconnecting Mechanical Equipment (HVAC), fine spraying amended water in the work area, preparing
Gaylord boxes, wrapping beams and lighting fixtures. Inspecting the critical barriers and re-sealing with
duct tape, erecting scaffolds and platforms in various locations, numerous Gaylord boxes and poly
wrapped beams were at various locations on each floor ready to be taken out
Inspection was done on the Micro trap Machines and the Micro trap tents and on all the work area.
3'“ floor, workers were found in the process of scraping and boxing fireproofing, fine spraying amended
water in the work area, preparing Gaylord boxes.
Inspection was done on the Micro trap Machines and the Micro trap tents and on all the work area.
I exited the work area after decontaminating and signing the log book.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor|^s^ial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
C ITY_D EP_WO RBY_C AN NAT A SU B POO0131172
NYC-WTC_000182023
OCR can misread numbers and units. Confirm readings against the page image before using them.