Asbestos inspection log, 130 Liberty Street, June 6, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on June 6, 2009, by TRC Environmental Corp.

NYC-WTC_000181990
Page image
Scanned page image, NYC-WTC_000181990
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 06/06/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Fnvirnnmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proi. Mgr/TRC Environmental 9:20 am to 11:00 am

I arrived at the premise at 9:20 am. LVI schedule informed that activities include: fine clean floor on 3'“' and 2"'’ floors, clear floor, scrape fireproofing in shafts, demo West side MER, loading out boxes to ATC trailer on 1®' floor, demo pipes & ducts on ramp in the basement. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 2"'’loor. One worker was present for the, decon maintenance, cleaning and organizing the clean room. Negative air pressure on the floor was -0.031. I used “C” stainwell to proceed to the 3"“ floor. 3'“ Floor -16 Asbestos handlers were present on the floor, clearing off the floor. At the north/west side of the work area workers were harnessed in scissor lifts washing beams, columns and ceilings, fine cleaning the area. Other workers were cleaning the floor using wet-dry shop HEPA vacuum, fine spraying amended water in the work area; replacing micro traps machines, filters; preparing and loading out sprayed and sealed boxes. 2 Gaylord boxes were on the floor ready for load out. 20 Micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used "C” stairwell to proceed to the 2™“ floor. 2"” Floor - 6 workers were found inside the work area, cleaning, washing equipment, pieces of demolished scaffolds at the Atrium area; covering critical barriers with foam and poly, picking up excess water and wet gross saturated debris; sweeping the floor using equipment equipped with HEPA filters; inspecting micro trap machines, replacing filters, resealing the platforms of shafts and floor, preparing boxes. 3 Gaylord boxes were on the floor sealed, sprayed and ready for load out, 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. After following the decontamination procedure I signed the log book, used north hoist to return to the ground floor. Using west side decon I proceed to the V floor work area. Negative air pressure on the floor was -0.031. Two workers were present for the decon maintenance, organizing the clean room. V Floor - 37 workers were present on the floor. Workers on scaffolds inside the east, east2 and west2 side shafts in the process of scraping fireproofing, washing the platforms of the scaffolds, spraying with amended water, cleaning the floor from debris and placing into the boxes. Workers ion scissor lift and mezzanine at the west side area were demolishing cinder wall, spraying with amended water, picking up debris and placing into the boxes. Other workers were cutting metal fixtures from the ceiling, preparing and loading out boxes through the waste decon. 20 Gaylord boxes were on the floor ready for load out. 40 micro trap machine were on and 5 on stand by. Inspection was done on micro trap tents. Using entrance from the first floor I proceeded to the basement. Bsmt - 11 Asbestos Handlers were at the south/west side work area, cutting sheetrock on ramp to reach the conduits for demo, placing debris into the boxes, spraying the area with amended water, covering the floor with plastic. 10 micro trap machines were powered on. 1 went back to the 1 floor. After following the decontamination procedure I exited the work area. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattari 2=Bronx 3=Brooklyii 4=Queens 5=Richniond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131116

NYC-WTC_000181990

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181990Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →