NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premises: Inspection Date:
130 Liberty Street 07/09/09
Floor Zip Borough Block Lot Squad # Badge # AO11
Various 10006 1 54 1 1
Inspector Building Type Basis of Inspection Photos Taken
N. Patel A TRU2068MN08 Yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 (973) 772-3660
Laboratory Name Owner’s Name
TRC Environmental corp. The Lower Manhattan Development Corp.
Address City Address City
1430 Broadway New York One Liberty Plaza New York
State Zip Phone state Zip Phone
NY 10018 NY 10006 (212)962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr. /TRC Environmental 9:40 am - 12:00 pm {1®‘floor visual) and 1:50 pm
-2:35 pm (V* floor & basement).
Inspection # 1
On arrival at the site, I met with LVI and TRC personnel who told me about visual inspection of T“ floor. I along
with Rammohan of DEP, Mr. Paul Billera of DOL and Mr. Bob Fitzpatrick of EPA entered to the containment
area of the L* floor with PPE. There were 20 handlers and supervisors from LVI, TRC and ATC were on the
floor ready to help in visual inspection. I found suspect ACM on the joints of the beams and columns in the East
side. I called Mr. Fitzpatrick of EPA to check what I found. He agreed and found some more ACM on the same
area. Mr. Billera of DOL found some Caulking'on the steps in the west side of the floor. Mr. Rammohan and
Mr. Fitzpatrick found foams on top of the brick wall. We all agreed that the 1“’ floor area was not properly
cleaned. So it was fail in the final inspection. Negative Air pressure was -0.031. We all exited the work area
after decontaminating and signing the log book.
Inspection # 2
On the T' floor, I entered to the work area with the PPE and met Mr. Johnny Rodriguez, supervisor. There were
20 workers working on the floor. They were removing foams fi'om the top of the brick walls, cleaning the beams
and columns, HEPA vacuuming the floor area, bagging the debris and clear off floor. I took the long distance
photos of the strips where Rammohan & I found suspect ACM and also workers removing Foams from wall. I
used steps to go to basement.
In the basement, I met Mr. Jose Jimenez, supervisor. There were 35 workers working on the floor. They were
scrapping fireproofing the ceilings, spraying amended water on the debris and boxing it, loading out boxes,
cleaning water fiom the floor, demolishing the wall with the Jack hammer without HEPA. I took photo and told
Bovis personnel. The handler attached the HEPA with the Jack hammer. Three bulb cages were opened and
without light bulbs. I took photo and told Mr. Luis Castella, supervisor to fix it. Fifty two (52) Gaylord boxes
were on the floor ready to be load out. He called the electricians to fix that. Negative pressure was -0.038.1
exited out after decontaminating and signing the log book.
NOV# RESULT
2
NOV#
NOV# bUrERVlSOR
Borough l=MaDhatlan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Projcct not started (no NOV) 5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131025
NYC-WTC_000181946