NYC 9/11 Public Portal Document
SWANKE HAYDEN CONNELL @002/002
11/16/08 09:07 FAX 2122190256
SwANNE Hayden CoNKELi Architects
Memorandum
Project Name and Address: Projett No:
5576A
Mayor’s Office of Emergency Management Project Direct or/Managen
7 World Trade Center Meinhardc/Aliotta
New York, New York Client:
Silverstein Properties, Inc.
Sabject:
Ceiling @ Press Room & EOC
To From Date Prepared
Martin Schneider / Ambassador Construction . Juan M. Mejia Nov 16,1998
Please be advised that we have walked the 23"*. floor last week and noticed that as I had mentioned in my previous observations the
week before, the Press Room ceiling is now completed including light fixtures and none of the pipes, hmgers, duct work and walls
above the grid have been painted.
It is going to be very hard to paint above the grid without causing damage to the grid and lights and still have an acceptable job.
Please address this matter as soon as, possible, since this is one of the rooms, which are more important in terms of visibility of the
project.
I would also like to remind you that the ceiling in front of the podium at the EOC has complicated detailing for the hanging of the 8
television monitors and the pocket detail for the cabling and the electrical outlets for the monitors. It is very important that you
expedite the shop drawings for this area, so that we can coordinate properly and not have these details fall through the cracks at the
end of the job.
If you need any information or coordination from our office in the above matters please call.
CC: Glen Pymecto / DCAS
Joe Aliotta / SHCA
John Vande Plasse / SHCA
Josh Ginsburg / SHCA
cc; Joe Aliotto / SHCA
\\.NEVWORK(M«>ROJECT3.SS78U\OEMSOC8tMEMCMMBABBADORH.1S.9>.DOi;
Swanke Hayden Connell LLd./Swanke Hayden Connell & Partners LLP
295 Lafayette Street, New York, New York 1OC12
212226 9696. Fax 212 219 0059