Lee. / ________ i
NYC Office of Emergency Management Work completion required for Motorola to start Installation 7 WTC - 23 Floor: • Electrical Riser to Equipment room 11/15/98 • Air-conditioning 11/20/98 • Raised Floor 11/30/98, • Painting 11/30/98 • Room construction 11/30/98
7 WTC - Roof Shelter and AntennayMounting: • Approve mounting details for antennas 9/1/98 • Complete I - Beam mounting for antennas 11/15/98 --- • Grounding for roof area antennas/Shelter 11/15/98 • Electrical riser to shelter 11/15/98 • Complete radio room construction 11/20/98 • Complete Air conditioning 11/30/98 • Complete Painting 11/30/9^^ • Complete Riser for the radio cables to 23 fl 11/1/98 VX • Complete 2-TIto 2 Lafayette St. 11/30/98
2 LaFayette St- R^adio Room & Roof Antenna Mounting: • Mounting bases for 9 ant poles mounts 11/25/98 • Grounding for roof area antennas 11/25/98 • Grounding for Radio Room 11/25/98 • Electrical riser to shelter 11/18/98 • Complete radio room construction 11/18/98 • Complete Air conditioning 11/18/98 • Complete Painting 11/30/98 • Complete the 2-Tl Lines to 7 WTC 11/30/98
Robert B. Hudson 11/3/98
NYC-WTC_000173699
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173555
Architectural firm observation regarding ceiling conditions on the 23rd floor at OEM offices following site walkthrough.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166699
Minutes from the 18th consultant meeting at 7 World Trade Center dated November 24, 1998.
2 shared non-person entities · Same agency, volume and box · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173575
Request for Information log documenting responses to queries about wall offsets and electrical outlet locations at the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166743
Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.
1 shared non-person entities · Same agency, volume and box · similarity 0.889
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173652
Log of incoming and outgoing faxes between Ambassador Construction and the Office of Emergency Management regarding project communications.
1 shared non-person entities · Same agency, volume and box · similarity 0.878
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.870
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172600
Letter submitting a revised HVAC quotation totaling $1,564,675 for the Mayor's Office of Emergency Management at 7 World Trade Center.
Same agency, volume and box · similarity 0.866
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173854
Meeting minutes from Ambassador Construction regarding project status for the Mayor's Office of Emergency Management at 7 World Trade Center.
1 shared non-person entities · Same agency, volume and box · similarity 0.866
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167734
Memo summarizing outstanding OEM equipment product data and catalog cuts for the Mayor's Office of Emergency Management project at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.862
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
1 shared non-person entities · similarity 0.862
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 2 Lafayette Street · 1 pages · confidence 0.15 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000173652
Log of incoming and outgoing faxes between Ambassador Construction and the Office of Emergency Management regarding project communications.
Filed in the same folder
Similar indexed content
Similar indexed content
NYC-WTC_000173555
Architectural firm observation regarding ceiling conditions on the 23rd floor at OEM offices following site walkthrough.
Similar indexed content
NYC-WTC_000166699
Minutes from the 18th consultant meeting at 7 World Trade Center dated November 24, 1998.
Similar indexed content