City of New York Confidential Sheetl Page 2
Work Specified Lowest Bidder Cost 2nd Bidder cost 3rd Bidder Cost
9. Plumbing PAR/ Martin Schneid $389,675 MFSInc 407,500 Lab Plumbing & Hea $408,000
Not Inc: Rigging tank Not Inc: Supply of Appliances.
HWAT? —
-1
Not Clear: Sump Pump.'
check w/20 Who supplies hot Water Dispenser
10. Painting & Wallcov Bond Painting Co Inc 53100 State Painting & D 54335 Prestige 57300
--L-
11. Floor, Base & Carp jConcorde Flooring^ 150935 Integrity Flooring j 153000 Lasher White 188000
12. Iron & Steel Newco Ironworks, Lt $180,825 Burgess Steel.. $264,400 Feinstein Iron Work $295,000
Scope of work poorly written incljdijitional: incl. additional:
■ryrsisedJteef-friaterial 1)wire mesh wall=$7,500
2)metal ramp :2)new bilco door
77 7 7 7.2^^“^ 3)bullet resistant panels
13.Cement & Concrete Cirocco! Ozzimo $100,765 L.I.C. Construction^ $115,700
Bid incorporates CMU, cement & Bid breaks the job CMU $29000
combine w/14 and ; grouting for $131 ! concrete 115700
may be 26 plus see fireproofing for 7500 Plus see Fireproofing = $ 7,000
Poorly broken down
14.Masonary/ Plaster L.I.C. ConsTruction ‘<$29 rowPCirocco! Ozzimo $30,550
Includes grouting- to be verified.
Combine w/13
IS.Sprinklers Abco Peerless Sprink 128,400 Sirina Fire Protecti $139,325 Active Fire Sprinkler' 175,000
Not lnc:Foam Systems
Not Clear:Detector for Preaction-Who Supplies it? Lo U-o J^foV j) —-
$178,250 ‘Airflex
__ I_____
16.Architectural Metal Brandt $137,250 Coordinated Metal ln| 336000
No unit price incl-original quote=$137,250 Podium Wall Not Bid
check scope of work lium walls=$41,000 All this work is duplicatedin sec.33
w/33
17.Glass, Glazing & Mir D.Shuldiner Inc.
1 1 $22,700 ,
Metal Panel Wall.???
S&J
Math do not add up
23575 Creative |no bid
____ 2 .J__
4 r
tr
ZvO B /
7 World Trade Center-Bidder List Page 2 6/3/98 10:41 AM