Work Specified i Lowest Bidder Cost 2nd Bidder cost i3rd Bidder (Cost
1. Demolition Da Costa Demolition $13,000 Liberty Contractin ! $15,000 I Tri State Dismantling $16,000
- -I___
2. Rubbish Removal No Documentation Provided- Bid of $35100
i
.J____
3. Drywall Carpentry Precision Interiors Co $390,1sea CLK Construction $391,995 Sweeney & Harkin C $393,072
Not lnc:Curtain Wall @ Press Room
Work At Elev Lobby
4. Hollow Metal Secure Door And Har I$13,120 WeinsteiixA+loltz $13,502 ACME $15,800
Doors w/ Hardware I$50,495^ ©Oofsonly Only Doors
based on 44 Doors and 39 frame! 43 doors & 41 frame 38 frame &41 doors
5. Finish Hardware Weinstein & Holtzma 30,109 Architectural Hard 35800 Secure Door And Ha 37370
hardware
6. Ceilings Superior Acoustics 289400 ESS & VEE Acoustical 292188 National Acoustics 357450
Math adds up to 184009
7. Electric & Fixtures Robert Samuel Inc. 3,663,500 Forest Electric Cor 4,105,000 Adco Electrical Corp 4,139,000
Not Inc: leak detection
audiovisual wiring&plate panel
Antenna work
Surge Protection
Wiring for foam system for the Fuel oil tank.
S^HVAC Kaback 1.329, sea Penguinj^/C^orp^ 1,340,000 PJ Mechanical ! 1,426,025
. J.------------------
Not clear: dampers Not lnc:Fuel Oil
I are they included? LOUVERS__________
backflow Digging Backfilling
Water leak Detector 7thfl.
Louver supplied by a metal panel wall contractor.
r.
7 World Trade Center-Bidder List Page 1 6/3/98 11:58 AM