NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Sheet 1
Document / 5 pages

Detailed bid comparison sheet, City of New York

Machine-extracted title · confidence 50%

Sheet comparing bids from three contractors for doors, hardware, and construction services at the Mayor's Office of Emergency Management project.

NYC-WTC_000173236–000173240

Folder label: “Sheet 1

Page image
Scanned page image, NYC-WTC_000173237
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

City of New York Confidential Sheetl Page 2

Work Specified Lowest Bidder Cost 2nd Bidder cost 3rd Bidder Cost 9. Plumbing Spar/ Martin_Schneicl $389,675 MFSInc 407,500 Lab Plumbing & Hea! $408,000 iNot Inc: Rigging tank Not Inc: Supply of Appliances. iHWAT? jNot Clear: Sump Pump.

check w/20 Who supplies hot Water Dispenser

10. Painting & Wallcov Bond Painting Co Inc 53100 State Painting & D 54335 Prestige 57300

11. Floor, Base & Carp Concorde Flooring S 150935 Integrity Flooring 153000 Lasher White 188000

12. Iron & Steel Newco Ironworks, Lt $180,825 Burgess Steel.. $264,400 Feinstein Iron Work $295,000 Scope of work poorly written incl.additional: incl. additional: Ijraised floor material 1)wire mesh wall=$7,500 2)metal ramp 2)new bilco door 3)bullet resistant panels 13.Cement & Concrete Cirocco! Ozzimo $100,765 L.I.C. Construction! $115,700 Bid incorporates CMU, cement & Bid breaks the job CMU $29000 combine w/14 and grouting for $131,315 concrete 115700 may be 26 plus see fireproofing for 7500 Plus see Fireproofing = $ 7,000 Poorly broken down 14.MasonaryZ Plaster L.I.C. Construction $29, WS Cirocco I Ozzimo $30,550 Includes grouting- to be verified. Combine w/13

IS.Sprinklers Abco Peerless Sprink 128,400 Sirina Fire Protect! $139,325 Active Fire Sprinkler 175, Slilil Not lnc;Foam Systems Not Clear: Detedor for Preaction-Who Supplies it?

16.Architectural Metal Brandt $178,250 Airflex $137,250 Coordinated Metal In 336000 No unit price incl-original quote=$137,250Podium Wall Not B d check 8cope_of work +podium walls=$41,000 All this work is duplicated in sec.33 w/33 Metal Panel Wall.???

17.Glass, Glazing & Mir D.Shuldiner Inc. $22,700 S&J 23575 Creative no bid Math do not add up

7 World Trade Center-Bidder List Page 2 6/3/98 11:58 AM

NYC-WTC_000173237

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173237Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Bid comparison sheet excerpt, City of New York · Box 7DCAS

NYC-WTC_000173231

Excerpt from a bid comparison sheet listing costs for dismantling and other services submitted by multiple bidders for the project.

8 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.997

machine-extracted · confidence unavailable · Check page ↗
Bid comparison sheet excerpt, City of New York · Box 7DCAS

NYC-WTC_000173226

Sheet comparing bid costs from multiple contractors for dismantling and other services related to the project at 7 World Trade Center.

6 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.994

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →