NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Sheet 1
Document / 1 page

Cost estimate sheet for Mayor's Office facility upgrades, 1998

Machine-extracted title · confidence 91%

Itemized cost breakdown for fuel tanks, switchgear, conduit, and security installations at the Mayor's Office of Emergency Management.

NYC-WTC_000173093

Folder label: “Sheet 1

Page image
Scanned page image, NYC-WTC_000173093
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Sheetl

___________________ A_____________ B C 1 Cost of Emergency Items . 2 for the Mayor's Office of Emergency Management 3 Cost ‘Attempt to reduce cost to _£ 5 Emergency Generator $717,890 ( 6 Fuel oil tank, pumps 7 Switchgear 8 Running conduit from 7th floor to the 23rd floor 9 fel cable for press 10 Folding VX^II 11 Preaction Sprinklers for Watch Command Area. 12 Security Cable_____ 13 Security wall and partition 14 Hurricane Wall 15 11000 gal water tank on the 7th floor-& pumps 16 Special Door- 3 bullet proof 17 Audio Visual 18 19 20 General condition 8% 21 Overhead ^Fees^% 22 Insurance 1.25% 23 24 Total 25

I a XT-

Page 1

NYC-WTC_000173093

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173093Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →