AMBASSADOR CONSTRUCTION CO, INC,
i / JUN- 91996 i
Junes. 1998
Mr, Walter Weems
Silverstein Properties, Inc.
7 World Trade Center
New York, NY 10046
RE; Mayor’s Office of Emergency Management
J 7 World Trade Center
,( 1st. 7th & 23rd Floors
Dear Mr, Weems;
W'e are in ret^ipt of the response from the Division of Real Estate Service regarding the
above referenced project. The following is Ambassador’s response;
ItewMo^J
The cost representation in our estimate does not include Addenda 1. We did not have
sufficient time to indude the addenda in our original estimate. The cost estimate for Addenda
1 Wil! be submitted shortly.
itenLCiis._3
The rubbish removal cost of $36,100 will be removed The cut and patch line item is not a
general conditions item, tt is a valid part of the work.
ItficoLWa. 4
Our cost estimate does not include the cost for the tenant's use of the existing fuel lines. That
cost has been submitted separately by Silverstein
i lifiDO.No 5
■j Ambassador’s line item for Itie Generator Test represents the coat for the Design Engineer to
go to the factory and test the generator as called for in the Specifications, page PPS-23 under
Factory Testing. The cost represents time, travel and meals for the engineer. The cost for
Generator Testing in the electric trade bid is the testing of the generator on the job site as
called for in the .Specifications, page PPS-24 under Site Testing.
General Comment Exhibit “X”
•i ItanUc. .1
'i We will comply by supoSying the additional blds requested.