NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center 1st, 7th & 23rd Floors
Document / 2 pages

Letter re: OEM estimate response, June 1998

Machine-extracted title · confidence 95%

Letter from Ambassador Construction responding to the Division of Citywide Administrative Services regarding project estimates.

NYC-WTC_000173319–000173320

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1st, 7th & 23rd Floors

Page image
Scanned page image, NYC-WTC_000173319
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

' 06/11.-'98 09:37 NO. 037 P03 T I 1

AMBASSADOR CONSTRUCTION CO, INC,

i / JUN- 91996 i

Junes. 1998 Mr, Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York, NY 10046

RE; Mayor’s Office of Emergency Management J 7 World Trade Center ,( 1st. 7th & 23rd Floors

Dear Mr, Weems;

W'e are in ret^ipt of the response from the Division of Real Estate Service regarding the above referenced project. The following is Ambassador’s response;

ItewMo^J The cost representation in our estimate does not include Addenda 1. We did not have sufficient time to indude the addenda in our original estimate. The cost estimate for Addenda 1 Wil! be submitted shortly.

itenLCiis._3 The rubbish removal cost of $36,100 will be removed The cut and patch line item is not a general conditions item, tt is a valid part of the work.

ItficoLWa. 4 Our cost estimate does not include the cost for the tenant's use of the existing fuel lines. That cost has been submitted separately by Silverstein

i lifiDO.No 5 ■j Ambassador’s line item for Itie Generator Test represents the coat for the Design Engineer to go to the factory and test the generator as called for in the Specifications, page PPS-23 under Factory Testing. The cost represents time, travel and meals for the engineer. The cost for Generator Testing in the electric trade bid is the testing of the generator on the job site as called for in the .Specifications, page PPS-24 under Site Testing.

General Comment Exhibit “X”

•i ItanUc. .1 'i We will comply by supoSying the additional blds requested.

Continued /

,s> 31 f MAUISON AVENUE, NEW YORK, NY 10017. 2(2 922 1020. FAX 212 949 9Z62

NYC-WTC_000173319

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173319Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Cost estimate review request, OEM 7 WTC, June 1998 · Box 7DCAS

NYC-WTC_000173109

DCAS memo requesting clarifications and confirmations on itemized cost estimates for Mayor's Office of Emergency Management project at 7 World Trade Center floors 1, 7, and 23.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.943

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →