Raised floor installation proposal, Office of Emergency Management, 1998

Machine-extracted title · confidence 95%

Proposal by Erector Specialist to install various raised floor systems at different heights on the 23rd floor of 7 WTC.

NYC-WTC_000172828–000172829

Folder label: “Office of Emergency Management

Page image
Scanned page image, NYC-WTC_000172828
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document 05/14/1998 06:57 5166924428 ERECTOR TECIALIST PAGE 02 •. RAIBED FLOOR ONSTALLATION ANDLFAVICE ei ACOUITICAL CELMOS DAY WAW PARTITIONE ERECтOR SPECIALIST. inc: 20 Woodlee Road Tel. (516) 692-4424 :Cold Spring Harbor, New York 11724 Fax (516)682-4428 May 13., 1998 Ambassador Constriccion Co., Inc 317 Madison Ave, New Xork, NY 1001? Atn.: Martin Schnicer Re: Orfee of Y'mergency Management, 7 World Trade Center, 23" Floor, New York, NY We propose to fuhnist nnd install 6846 SF of Intertace AR Tec Crete II raised floor systei with bare panel finish on bolted rigid grid strmger with gasket understnicutre to a finished floor height of 4", to furnish and install 2294 of same to a flotshed fhoer height of 8", to furnish and install 130 SP of same to a finished foor height of 16" furnish and inscalt MO ISF of same to a FFH of 20", to furnish and install 456 SF of same to a FFH of 25", to furnish and install 88 ST of same to a FFH of 32" and to fumish and install 756 SF of Interface AR Too Crete II raised foor system with Viny! Compositión Tile finish TQ -218 by Azrock on bolted rigid grid stringer with "gasket understrucutre to a finished floor height of 8". The following will be included: 1. Presnap pedestal locations 10' on center 2: Overtime unloading 3. 5 Ramps: 141 SP includes all. 4. 1-4" Step 22' wide at Press toom S. 2 - 3 Riser Steps 41 aide at Press room risers 6. 7. 2-3 Riser Steps 41 Mde at Podum 1.-6" Step 24' wide at riser opposite Podium 8. 22 LF of foor mounted clear anodized aluminum handrail 9: 19 LF of walt mounted clear anodized aluminum handrail. 10:144 LF of alüminum ascia. 11:85 cutouts with trimmed edges Subtotal $95,292.97 Tax Cost: $7,262.03 $102,555.00 NYC-WTC_000172828

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172828Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167693 · Box 7DCAS

Document listing furniture system and loose furniture manifests for review regarding the Mayor's Office of Emergency Management space at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →