NYC-WTC_000172724
Correspondence memo dated May 20, 1998 concerning the Mayor's Office of Emergency Management at the 7 World Trade Center.
Same agency, volume and box · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗Fax cover sheet from Integrity Carpet submitting a revised proposal for carpet installation on the 23rd floor of 7 World Trade Center.
NYC-WTC_000172725–000172726Folder label: “Proposal # 0262R-2®OEM 7 WTC 23rd FL”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
05/20./98 17:04 ©212 725 1705 INTEGRITY CARPET @002
IntegrltyFlooring May 20'^ 1998
Mr. Jack Kline Ambassador Construction Co. 317 Madison Avenue New York, NY 10001
Via Fax: 212 949-9762
Reference: Proposal # C'262R-2 OEM7WrC 23"^ FL
Dear Mr. Kline:
Please consider this to lx our fbrnal revised proposal basec on drawings A-23’5 submitted by Swanks Hayden Connel, and carpet & resilient flooring specification dated 5/04/98- Integrity Floorinjn, Inc. proposes to fumi^ & install, i3»-01, (;P-02, VCT-1, VCT-2, B-1, B-2, RN-1, &'Rs-1 as foUows:
Material Quantity Unit Cost Total CA-01 SY 2451.8 $41.50 1011749.7 , < y CA432 SY' 639.86 $45.62 29(190.41 VCT-1 Round sf' 3375 / $221 7458.75 VCT-2 Round sf' VCT-Pattem Labor SF Llzi~ZZI 540 $1.53 $2-53 413.1 1366.2 Reducer LF 192 $4.38 8140-96 RB-1 Flat lf' 3800 8264 RB-1 Cove LF 100 1218 RB-4Cove LF 800 Il 744 Nosing LF 236 $7.35 1734.6 Price $153,000 Tax $0 Total $153,000 ,
Qualifications: All work to be convicted by qualified union personnel during normal working hours. Our cost is cornplete with materials, freight, handling & delivery, and installation of floor co vering and acce; sones.
Exclusions; HVAC Rm., installation of VCT over raised floorinejtax, cleaning and/or waxing, protection, overtime, rubbish removal, floor preparation, ramping imd any unusual cut-outs or extra labor. - -
J - Integrity Flooring. Inc. Z 'yZ-'’ ■“.? Ten East 40th Street New York. NY 10016 phone 212.72S.1313 tax 212.725.1705 A RfjOJrcc ATcnoL AftiUacs
NYC-WTC_000172725
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000172724
Correspondence memo dated May 20, 1998 concerning the Mayor's Office of Emergency Management at the 7 World Trade Center.
Same agency, volume and box · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172721
Proposal letter from Concorde Flooring Systems regarding flooring work for the Office of Emergency Management at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.874
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172831
Proposal from Computer Floors Inc. dated May 27, 1998 to supply materials and labor for computer flooring at the World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170836
Submission of a ten million dollar construction bid for demolition and tenant fit-out on the 7th and 23rd floors.
1 shared topics · Same agency, volume and box · similarity 0.863
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.870
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000136109
Contractor invoice application noting substantial completion and requesting missing cleaning checklists for common spaces.
1 shared topics · similarity 0.869
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000131071
Letter from an insurance representative acknowledging a DEP request and confirming that a cleanup was performed after the World Trade Center collapse.
Similar document embedding; no shared entity or topic indexed. · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115577
Letter from a hardware group to the DEP regarding the timing of exterior building cleaning and insurance claims.
Similar document embedding; no shared entity or topic indexed. · similarity 0.867
machine-extracted · confidence unavailable · Check page ↗Similar document embedding; no shared entity or topic indexed. · similarity 0.867
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134054
Final notice urging building owner to participate in the DEP debris cleanup program.
Similar document embedding; no shared entity or topic indexed. · similarity 0.864
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000116112
Agreement between the City of New York and a landowner for the removal of foreign material from building exteriors.
Similar document embedding; no shared entity or topic indexed. · similarity 0.862
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127619
Cover sheet for a fax transmission dated October 16, 2002, related to 94 Fulton Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.862
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000172831
Proposal from Computer Floors Inc. dated May 27, 1998 to supply materials and labor for computer flooring at the World Trade Center.
Similarity score 0.931 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172825
Estimate from Raised Floor Installation Inc. for raised floor work on the 23rd floor of 7 World Trade Center, dated May 26, 1998.
Similarity score 0.918 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172828
Proposal by Erector Specialist to install various raised floor systems at different heights on the 23rd floor of 7 WTC.
Similarity score 0.918 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168493
Memo submitting Change Order #66 for $15,460 to install floor boxes and relocate wiring at 7 World Trade Center.
Similarity score 0.917 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172721
Proposal letter from Concorde Flooring Systems regarding flooring work for the Office of Emergency Management at 7 World Trade Center.
Similarity score 0.916 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171455
Ambassador Construction letter dated February 1, 1999, submitting Change Order #66 for $15,460 to install floor boxes and relocate wiring at 7 World Trade Center.
Similarity score 0.913 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000172724
Correspondence memo dated May 20, 1998 concerning the Mayor's Office of Emergency Management at the 7 World Trade Center.
Similar indexed content
NYC-WTC_000172721
Proposal letter from Concorde Flooring Systems regarding flooring work for the Office of Emergency Management at 7 World Trade Center.
Similar indexed content
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Similar indexed content
Contractor invoice application noting substantial completion and requesting missing cleaning checklists for common spaces.
Similar indexed content
NYC-WTC_000172831
Proposal from Computer Floors Inc. dated May 27, 1998 to supply materials and labor for computer flooring at the World Trade Center.
Similar indexed content