NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/7DCAS/OEM;®Proposal
Document / 3 pages

Flooring proposal for OEM, 7 World Trade Center, May 1998

Machine-extracted title · confidence 95%

Proposal letter from Concorde Flooring Systems regarding flooring work for the Office of Emergency Management at 7 World Trade Center.

NYC-WTC_000172721–000172723

Folder label: “OEM;®Proposal”

Page image
Scanned page image, NYC-WTC_000172723
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

05/19/1993 14:34 2126851485 CONCORDE FLOORING PAGE 04

'■ ■■G^ERAJ. NOTES (^^ss Otherwise noted in DonTract)

1. All WORK TO BE PERFORMED ON R^OlAR TIME AND DELIVERIES ON REGULAR TIME. 2. PHASING OF PROJECT IS NOT INCLl^e? . . ' ’ ' .3, Carpet restretch guaranteed-W^ months following installation. 4. Sub-floor PREPARATION is inclliUeo'(as required, Carpet and.-VCT areas only). 5. FLOOR PREPERATION IS LIMITED:TO|^SH PATCHING. /. 6. Furniture MOVING IS NOT iNCLob^i . . . / 7. Quantities may be subjectto vaWtion with on-site measurements AND/or available roll sizes. 8. SPECIAL OROER/CUSTOM CARPETlNfe-OUANTITIES-ARE SUBJECT TO'.ACCEPTANCE OF "MILL OVER RUN”. NOT TO EXCEED SIX PERCENT. ?’ ‘ 9. Carpeting colors may vary froB^ye lot to dye lot. , , 10. We do not sweep floors, scr^^floors Or remove nails from existing floors. We do not pickup daily scrapes or CENTER PILe RU|tSH. 11. We do not dispose of old CARP.^'j^ROM building. 12. We DO not vacuum. /bHY < . ' 13. We are NOT RESPONSIBLE FOR TE^HONE OR ALARM WIRE LOCATED UNDER CARPET.

We hereby . PROPOSE TO FURNISh|MATER1AL AND LAS0R - COMPLETE IN ACCORDANCE WITH THE ABOVE SPECIFICATIONS, FOR THE SUM OF $155,M5.35. • •/W ■■ All MATERIAL IS GUARANTEED TO BE'^TSPECtFlEp. . ALL WORK TO . BE COMPLETED IN A WORKMANLIKE MANNER ACCORDING TO STANDARD PRACTICeS.;;^Y ALTERAflCiNOR DEVIATION FROM ABOVE SPECIFICATIONS INVOLVING EXTRA COSTS WILL BE EXECUTED ONLY UPON-li^fl^EN ORDERS, AND WILL.BECOME AN EXTRA CHARGE OVER AND ABOVE THE ESTIMATE. All AGREEMENTS CONTlN0|j^^LipON STRiiKeS. ACCIDENTS OR bELAYS BEYOND OUR CONTROL. OWNER TO CARRY FIRE, TORNADO AND OTHER N^^^ARY INSURANCES. OUR WORKERS ARE FULLY COVERED BY WORKER'S COMPENSATION INSURANCE. ' b ' . '

AinHORiZED Signature; AHDfeN. BELARfgE..^^^ V. ' ; ;

=====ssa===s======js5=sasss==£S!^S=±=isi^^ . ■====ias==s=======s3==sasss=:ss?^^^s:=as5^a:as:=sss5===Ss±?^^ ACCEPTANCE; The ABOVE PRlCES.’-SpglkteATlONS AND CONDtTICWsX^ SATISFACTORY AJMD ARE HEREBY ACCEPTED. You ARE AUTHORIZED TO DO THE WOR^-AS SPECiFIED. PAYMENT WILL BE MADE AS OUTLINED ABOVE.

Signature: Date:

OEM 'Bb; PAGE 3

NYC-WTC_000172723

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172723Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Carpeting proposal cover sheet, May 1998 · Box 7DCAS

NYC-WTC_000172725

Fax cover sheet from Integrity Carpet submitting a revised proposal for carpet installation on the 23rd floor of 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.874

machine-extracted · confidence unavailable · Check page ↗
Computer flooring proposal for 7 WTC, May 1998 · Box 7DCAS

NYC-WTC_000172831

Proposal from Computer Floors Inc. dated May 27, 1998 to supply materials and labor for computer flooring at the World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.865

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000172720 · Box 7DCAS

Fax cover sheet transmitting a revised flooring proposal for the site to Ambassador Construction.

Similar indexed content

NYC-WTC_000136109 · Box DEP Box 56

Contractor invoice application noting substantial completion and requesting missing cleaning checklists for common spaces.

Similar indexed content

Compare copies and versions →