NYC-WTC_000172720
Fax cover sheet transmitting a revised flooring proposal for the site to Ambassador Construction.
Same agency, volume and box · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗Proposal letter from Concorde Flooring Systems regarding flooring work for the Office of Emergency Management at 7 World Trade Center.
NYC-WTC_000172721–000172723Folder label: “OEM;®Proposal”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
05/19/1998 14:34 2126851485 CONCORDE FLOORING PAGE 02
/NC. 31 EAST aaiMU STREET NEW YORK. MY 10016 S1E-B85-13aO FAX; 212.BBS-1AES E-MAIL.: CONCFLOORSl^AOk.CDM
May 19,1998 •OEM Arch; : Swanke Hayden Connell LTD. c/oAmbassador Construction GoR^;f ORAiMNo: A-23-5 317 Madison Avenue I Dated; ,?4/06/98 New York, NY 10017 '4':'
Attn: Mr. Martin Schneider Re: OEM Z:' 7 World Trade Center New York. NY 23“ Floor As per your request, we HERESy S^II^A proposal TO FURNISH AND INSTALL THE FOLLOWING ON STRAIGHT TIME WITH Union LABOR VIA spEciFicATiON^^^pW, AS follows:
Manufacturer: interfaceCarpettile Quality: RetrO CUshion bag Tile Color: 1046 Quantity: 2.47^^tig$37.65/S:Y. Method of installation; Cushk^'BXctile Complete for the sum of; $ 93,108.45 .C \ - 5:2: .. Manufacturer: Interface Quality; RETROl^teER CUSHION BACROLL Color; 1O48«TIE'/: Quantity; e4d-^W,$42.6^;Y. Method OF installation: V?
Complete for the sum of; .$ 27,551.90
YCI:3i Manufacturer: . AZROCI^' '- Quality; Color: Quantity: WrY-.-'. 3,645;^^@$2;1G/S.F,
Complete FOR THE SUM of: $ 7,654.50
VCT-2: Manufacturer: AZROofe..-, Quality; Y.'. Color: V-3QQ:;4>- ' Quantity: 225 SO^ $2,60/S.F. Complete FOR THE SUM of; ■■■ •. . . .. $ . 562.50 -i'- ■
• •; , Y OEM J . :?f^0Ei
NYC-WTC_000172721 w -..vW ■
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000172720
Fax cover sheet transmitting a revised flooring proposal for the site to Ambassador Construction.
Same agency, volume and box · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172725
Fax cover sheet from Integrity Carpet submitting a revised proposal for carpet installation on the 23rd floor of 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.874
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173761
Log sheet tracking construction inquiries regarding duct offsets and field conditions with pricing responses.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170836
Submission of a ten million dollar construction bid for demolition and tenant fit-out on the 7th and 23rd floors.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.866
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173324
Business proposal submitted by a contractor to the Mayor's Office for wall system work on the 23rd floor of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.865
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172831
Proposal from Computer Floors Inc. dated May 27, 1998 to supply materials and labor for computer flooring at the World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.865
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170914
Memorandum dated August 8, 1997, submitting a draft P&E form package for the Mayor's Office of Emergency Management project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.864
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000136109
Contractor invoice application noting substantial completion and requesting missing cleaning checklists for common spaces.
1 shared topics · similarity 0.874
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.871
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135975
Document containing illegible text or corrupted data within the Department of Environmental Protection's Athena D Terms records.
Similar document embedding; no shared entity or topic indexed. · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102076
Facsimile transmission cover sheet dated July 17, 2002, likely related to environmental or inspection matters at 15 Maiden Lane.
Similar document embedding; no shared entity or topic indexed. · similarity 0.865
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105047
Summary sheet documenting bulk and air sample counts for a site at 114 Greenwich Street within the World Trade Center cleanup program.
Similar document embedding; no shared entity or topic indexed. · similarity 0.865
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000172720
Fax cover sheet transmitting a revised flooring proposal for the site to Ambassador Construction.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172828
Proposal by Erector Specialist to install various raised floor systems at different heights on the 23rd floor of 7 WTC.
Similarity score 0.928 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170836
Submission of a ten million dollar construction bid for demolition and tenant fit-out on the 7th and 23rd floors.
Similarity score 0.927 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167327
Construction cost estimate submitted by Ambassador Construction for work on the 7th and 23rd floors of 7 World Trade Center.
Similarity score 0.926 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172831
Proposal from Computer Floors Inc. dated May 27, 1998 to supply materials and labor for computer flooring at the World Trade Center.
Similarity score 0.926 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170825
Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.
Similarity score 0.922 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Fax cover sheet transmitting a revised flooring proposal for the site to Ambassador Construction.
Similar indexed content
NYC-WTC_000172725
Fax cover sheet from Integrity Carpet submitting a revised proposal for carpet installation on the 23rd floor of 7 World Trade Center.
Similar indexed content
Contractor invoice application noting substantial completion and requesting missing cleaning checklists for common spaces.
Similar indexed content
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Similar indexed content
NYC-WTC_000173761
Log sheet tracking construction inquiries regarding duct offsets and field conditions with pricing responses.
Similar indexed content