NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Same agency, volume and box · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗Written response to FDNY review comments regarding fire department specifications for the MetroTech project in Brooklyn dated May 3, 1999.
NYC-WTC_000172343–000172346Folder label: “FIRE DEPT NY - PSAC1®#96-1378®11 METROTECH, BROOKLYN, NEW YORK 11201®Responses to review comments®Submission # 1”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
• O5/O0/99 PAX 2122190258 SWANKE HAYDEN CONNELL 1^004
Response to review comments FDNY - PSACl April 22, 1999 Page 3
[Responwi: Not Required.
d. Indicate the new walls dark to match the other floors.
Response: At this point in the project it will be very time consuming to revise all the drawings. This projects where originally to be done separately.
e. Explain the use of partition type 7c at 4* Floor offices and lb at S"" floor offices.
Response: In the 4*. Floor we used FDNY standards and other floors we used DoiTT standards as directed. (Mr. J. McCormick specifically requested this.)
f. Coordinate the door schedule with construction plans, see door 14, met/gl and '/z hr fire rated. Also door 24,27 is 'A hr or I hr FPSC door.
I Response: Will Comply.
g. Explain the use of slab to slab studs, with gypsum board above raised floor and full height insulation around storage room, lunch room, (ICO, offices 04-07, (7C) when at door the use of sill type C and ’/♦” glass panel sidelight will defeat the purpose of this expensive type of insulated partition which requires the removal of raised floor tiles.
[ Response: This is done for acoustic privacy between offices, not between offices and open area.
4. Drawing A-S-2
a. Explain the use of wall sill type B and door sill type A at all offices.
[Response: This is done for acoustic privacy between offices, not between offices and open area.
b. Explain the use of 1 ’A hr FPSC door with partition type 7D at offices 5-2, 5-3.
I Response: The fire enclosure is around the computer room not the offices.
5. Drawing A-S-3 and E-110 Clearly indicate the new / relocated light fixtures, only.
[Response; Will Comply
6. Drawing No. D-1 Explain the design intent and use of 3-layered gypsum board, insulated partition type next to '/<” glass / metal regular partition at the command center.
Response: The Acoustical consultant, Cerrami & Associates set the design criteria for the partitions. In reference to the glass enclosed command center, the entire center acts as a buffer between the data Center and the adjacent office space. In addition, FDNY specifically requested the glass enclosure.
\wBWYtniciMtPMMecT8U7iM\i I MTCOOcsicaaBsuia'oiinwssroNW to submittal m 4 anoc
Swankc Hayden Connell LtdJSwanke Hayden ConnclIMi Partners LLP 295 Lafayette Street, New York, New York 10012 212 226 9696, Fax 212 219 0059
NYC-WTC_000172345
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Same agency, volume and box · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167738
Responses to Department of Design and Specifications review comments on architectural outline specifications for the Mayor's Office of Emergency Management facilities at 7 World…
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗Same agency, volume and box · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173753
Record of construction inquiries concerning duct offsets and wet column encroachments with issued responses.
1 shared topics · Same agency, volume and box · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173761
Log sheet tracking construction inquiries regarding duct offsets and field conditions with pricing responses.
Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167813
Letter from DCAS reviewing Final Plans for the Mayor's Office of Emergency Management renovation and requesting consultant revisions.
Same agency, volume and box · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174016
Form recording site access authorization for contractor personnel at 7 World Trade Center on January 12, 1999.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173768
Document listing requests for clarifications on ductwork and column modifications with associated response dates.
Same agency, volume and box · similarity 0.905
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171829
Proposal for change order #2 to install cabinets, countertops, and paneling at the Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171248
Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172166
Memorandum responding to Port Authority inspector requests for self-closing access hatch and Inergen system tie-ins for the fuel oil tank room.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
1 shared non-person entities · Same agency, volume and box · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Similar indexed content
NYC-WTC_000167738
Responses to Department of Design and Specifications review comments on architectural outline specifications for the Mayor's Office of Emergency Management facilities at 7 World…
Similar indexed content
Similar indexed content
NYC-WTC_000173753
Record of construction inquiries concerning duct offsets and wet column encroachments with issued responses.
Similar indexed content
NYC-WTC_000173761
Log sheet tracking construction inquiries regarding duct offsets and field conditions with pricing responses.
Similar indexed content