NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Same agency, volume and box · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗Written response to FDNY review comments regarding fire department specifications for the MetroTech project in Brooklyn dated May 3, 1999.
NYC-WTC_000172343–000172346Folder label: “FIRE DEPT NY - PSAC1®#96-1378®11 METROTECH, BROOKLYN, NEW YORK 11201®Responses to review comments®Submission # 1”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
05/0.</99 09:33 FAX 2122190258 SWANKE HAYDEN CONNELL 1^003
Response to reviev; comments FDNY-PSACl April 22, 1999 Page 2
7. Clarify the purpose of blank drawing TC-05.
I Response: It’s part of telecom set to reference equipment to specifications
8. Manifest List / Drawings for H. Miller work stations and office free standing furniture ai-e incomplete without panel sizes at existing plans, (SF 3): all codes of all components, including counters, upper storage cabinets, prices including city discounts for process of purchase orders.
FResponse: Will Comply
ARCHITECTUrtAL
1. Drawing T-1.
a. Clarify demolition notes in order to request the DOITT / NYPD written approval for die disconnection of any live electrical conduits and / or telecommunication wires prior to disconnection on general demo notes as well as each floor demo plan / notes. Also clarify note on A-3-2 on removal of telephone and data.
I Response: Will Comply
b. Clarify note on the “non-reraoval of existing floor tiles” and all areas that require partial removal of tiles where new slab to slab partitions will be installed and floor box relocated.
I Response; Could not find note referenced above
2. Drawing A-3-1. Clarify notes on: optl-ald (also on A-4-2), second temporary barricade location, “patch ceiling at new wall and floor”, and “patch and paint ceiling”.
[Response; Will Comply (Eye Wash stations will be relocated where required.)
3. Drawing A-4-2.
a. Clarify note on the radius of the console, A-4-2 or A-4-3.
(Response: Will Comply
b. Revise the UPS and Batt rooms as required after revised system decision of4/20/99.
Respon.se: Drawings reflect ups design directed by the Criminal Justice Coordinator and DCAS to provide a dedicated FDNY system within its space. Revised design approved after 100% CD is an additional service. Please approve additional service requisted by SHCA.
c. Is structural reinforcement required in the paper storage areas?
«HEWYDiuuMu*iiancnan«A\i i KrrcoocsicoiuiBNunxt'mtBSPONse to submittal »4 ».doc
Swaoke Hayden Connell Ltd./Swanke Hayden Connell ft Partners LLP 295 Lafayette Street. New York, New York 10012 212 226 9696, Fax 212 219 0059
NYC-WTC_000172344
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Same agency, volume and box · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167738
Responses to Department of Design and Specifications review comments on architectural outline specifications for the Mayor's Office of Emergency Management facilities at 7 World…
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168708
Letter from the Division of Real Estate Service notifying the Mayor's Office of Emergency Management that final plans for 7 World Trade Center have been reviewed.
1 shared topics · Same agency, volume and box · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173753
Record of construction inquiries concerning duct offsets and wet column encroachments with issued responses.
1 shared topics · Same agency, volume and box · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173761
Log sheet tracking construction inquiries regarding duct offsets and field conditions with pricing responses.
1 shared topics · Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167813
Letter from DCAS reviewing Final Plans for the Mayor's Office of Emergency Management renovation and requesting consultant revisions.
Same agency, volume and box · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174016
Form recording site access authorization for contractor personnel at 7 World Trade Center on January 12, 1999.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173768
Document listing requests for clarifications on ductwork and column modifications with associated response dates.
1 shared topics · Same agency, volume and box · similarity 0.905
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171829
Proposal for change order #2 to install cabinets, countertops, and paneling at the Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171248
Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172166
Memorandum responding to Port Authority inspector requests for self-closing access hatch and Inergen system tie-ins for the fuel oil tank room.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
1 shared non-person entities · Same agency, volume and box · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000167738
Responses to Department of Design and Specifications review comments on architectural outline specifications for the Mayor's Office of Emergency Management facilities at 7 World…
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172347
Job memorandum approving mechanical drawings for FDNY project with requested corrections including diffuser construction details and exhaust fan provisions.
Similarity score 0.931 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172131
Architects submit a proposal for additional architectural and engineering design services for the Mayor's Office of Emergency Management.
Similarity score 0.927 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.927 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172319
Architectural drawing index for the Mayor's Office of Emergency Management at 7 World Trade Center dated May 4, 1998.
Similarity score 0.925 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000169723
Official lease agreement between the City of New York and 7 World Trade Company, L.P. for space at 7 World Trade Center.
Similarity score 0.925 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Similar indexed content
NYC-WTC_000167738
Responses to Department of Design and Specifications review comments on architectural outline specifications for the Mayor's Office of Emergency Management facilities at 7 World…
Similar indexed content
NYC-WTC_000168708
Letter from the Division of Real Estate Service notifying the Mayor's Office of Emergency Management that final plans for 7 World Trade Center have been reviewed.
Similar indexed content
NYC-WTC_000173753
Record of construction inquiries concerning duct offsets and wet column encroachments with issued responses.
Similar indexed content
NYC-WTC_000173761
Log sheet tracking construction inquiries regarding duct offsets and field conditions with pricing responses.