NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/None
Document / 2 pages

Change order #4 for cabinetry, Nov 1998

Machine-extracted title · confidence 100%

Proposal from Superior Casework for cabinets and countertops in Room 23-09 at 7 World Trade Center.

NYC-WTC_000172208–000172209

Folder label: “None

Page image
Scanned page image, NYC-WTC_000172208
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NOU 18 ’98 11 Ml PR AMBRSSRDOR CONSTR. C0212 949 9782 TO 6693640 P.14/20 xi/xz/xase xe.u3 /lUOUbUQ ("b SUPERIOR CASEWORK PAGE 02

SUPERIOR ■ASEWORK INC.

November 17,199?

Mr. Martin Schneider Ambassador Construction Co., Inc. 317 Madison Ave. New York, N.Y. 10017 Dear Martin,

Please accept this change order proposal for the construction, delivery, and installation of cabinets, countertops, and Architectural Woodwork for The Office of Emergency Management, NYC as per drawing FSK-44 dated 11/11/98. The items included are as follows:

CHANGE ORDER #4

Room 23-09 5 lin. ft. Alter Makore Wall Unit to New Conftguration W/Ncw 3 % Closet @ Right 4,000.00

TOTAL including drawings and delivery S 4,000.00* •plus applicable sales tax

30% Deposit to Start 30% Upon Delivery 30% After Installation 10% After Completion of Punch List

70 BRIDSC ST. ■ BROOKUYN. NY T 1201 a 718-596-0908 a FAX 710-598-9078

NOU 17 1993 15:03 7135969076 PAGE,02

NYC-WTC_000172208

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172208Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #26 submission, 7 WTC, Nov 1998 · Box 7DCAS

NYC-WTC_000171821

Letter from Ambassador Construction submitting change order #26 for drywall and electrical patching work at the Mayor's Office of Emergency Management.

3 shared non-person entities · Same agency, volume and box · similarity 0.921

machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, 7 WTC OEM, Feb 1998 · Box 7DCAS

NYC-WTC_000170825

Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.921

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →