NYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
2 shared non-person entities · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.
NYC-WTC_000172054–000172066Folder label: “Hurricane Wall®O. E. M.®7 W. T. C.®98-145®Hurricane damper”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
08/31/98 MON 15:34 FA.l 2126453962 ' ' ' ■ KLaBACK AMBASSADOR
2. This time includes refabricating and installing new duct as required due to this change on Page #2: a. 1 Eketcher, 1 hour at $98.00/hr. / $ 98.00 b. 1 shop fabricator, 6 hours at $98.00/hr. 588.00 c. 2 field men. 5 hours at $98.00/hr. 2 980.00 d. Material 120.00 SUBTOTAL $1,786.00 ' 10% Overhead 178.60 10% Profit 196.46 $2,161.06 ’> X 15 Locations TOTAL $32,415.00
3. New due; per Page #3 : a. 1 scetcher, 1/2 hours at $98.00/hr. $ 49.00 b. 1 s lop fabricator, 4 1/2 hoitrs at $98.00/hr. 441.00 .'-'U C . 2 field men, 3 1/2 hours each at 98. )0/hr. i 686.00
d. Mat ‘rial ______ 95 . OOXf y. SUBTOTAL $ 1,271.00 10% Overhead 127.10 10% Profit■ 139.80 $ 1,537.90 X 5 Locations TOTAL $ 7,689.50
4. Ductwori: per Page #4: i a. 1 sLetcher, 1/4 hour at $98.!00/hr. $ 24.50 b. 1 si top fabricator, 2 1/2 hours at $98 OO/hr. i 245.00 c. 2 f;.eld men, 2 hours at $98.i00/hr. 392.00 d. Material 55.00 SUBTOTAL $ 716.50 10% Overhead 71.65 10% Profit : 78.81 $ 866.96 X 32 Locations TOTAL $27,742.72
NYC-WTC_000172060
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
2 shared non-person entities · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
1 shared non-person entities · Same agency, volume and box · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173279
A document listing Port Authority comments and associated cost adjustments for the Mayor's Office of Emergency Management renovation.
4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173408
Bulletins detailing costs for hurricane wall construction, column reinforcement, and sheetrock installation at the Mayor's Office of Emergency Management.
4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166743
Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.
1 shared topics · Same agency, volume and box · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173139
Letter from Ambassador Construction Company detailing scope and proposal changes for the Mayor's Office renovation.
1 shared topics · Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166730
Log entries recording received faxes and requests for information related to the 7 World Trade Center project in 1995.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173033
Letter detailing scope and cost reductions for electrical and audiovisual work at the Mayor's Office of Emergency Management following a review of bid items.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
Similar indexed content
NYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
Similar indexed content
NYC-WTC_000173279
A document listing Port Authority comments and associated cost adjustments for the Mayor's Office of Emergency Management renovation.
Similar indexed content
NYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
Similar indexed content
Bulletins detailing costs for hurricane wall construction, column reinforcement, and sheetrock installation at the Mayor's Office of Emergency Management.
Similar indexed content