NYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
2 shared non-person entities · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.
NYC-WTC_000172054–000172066Folder label: “Hurricane Wall®O. E. M.®7 W. T. C.®98-145®Hurricane damper”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
.03/31798 MON 15:35 FAX 2126418962j l ' • Raback AMBASSADOR 0003
5. Ductwoik per Page 5: a. 1 eketcher, 1/4 hour at $98.00/hr. $ 24.50 . b. 1 shop fabricator, 7 hours at ZT $96.00/hr. ” 686.00 c. 2 field men, 3 1/2 hours each at $9£.00/hr. 784.00 d. Mat erial 120.00 Y SUBTOTAL $ 1,590.00 10% Overhead 159.00 10% Profit 174■90___ $ 1,923.90 ^7^9" 2L 32 IjpcatXons _ TOTAL $61,564.80
7. The cos: for 88 Ruskin Model #CD80AF4 hurricaie dampers with 45" W.G. static pressur 2 $64,800.00 8. The cos; for the 32 architectural 10x10 grilles $ 4,800.00 TOTAL $207,656.00 9. Less - Amount included in base contract ($40,000.00) TOTAL $167,556.00
10. The add alternate for Valvcon electric 2 posit .on, 12 0 volt industrial actuators In Ductwork $37,000.00 In Hurr..cane Wall 52,000.00 TOTAL $89,000.00
Please be ajvised that the hurricane dampers have a 7 week lead time from tlie date of order-
If you have any questions regarding the above, please feel free to contact me. Very truly yours. KABACK ENTERPRISES, INC.
Donald M. Mur; Vice President DMM/maw
NYC-WTC_000172061
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
2 shared non-person entities · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
1 shared non-person entities · Same agency, volume and box · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173279
A document listing Port Authority comments and associated cost adjustments for the Mayor's Office of Emergency Management renovation.
4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173408
Bulletins detailing costs for hurricane wall construction, column reinforcement, and sheetrock installation at the Mayor's Office of Emergency Management.
4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166743
Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.
1 shared topics · Same agency, volume and box · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173139
Letter from Ambassador Construction Company detailing scope and proposal changes for the Mayor's Office renovation.
1 shared topics · Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166730
Log entries recording received faxes and requests for information related to the 7 World Trade Center project in 1995.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173033
Letter detailing scope and cost reductions for electrical and audiovisual work at the Mayor's Office of Emergency Management following a review of bid items.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
Similar indexed content
NYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
Similar indexed content
NYC-WTC_000173279
A document listing Port Authority comments and associated cost adjustments for the Mayor's Office of Emergency Management renovation.
Similar indexed content
NYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
Similar indexed content
Bulletins detailing costs for hurricane wall construction, column reinforcement, and sheetrock installation at the Mayor's Office of Emergency Management.
Similar indexed content