AMBASSADOR CONSTRUCTION CO. INC
October 8, 1998
Mr. Walter Weems
Silverstein Properties, Inc,
7 World Trade Center
New York, NY 10048
RE; Mayor’s Office of Emergency Management
7 World Trade Center -1, 7 & 23rd Floors
Change Order #015
Amb. Job # S57-5175
Dear Mr. Weems;
We are pleased to submit herewith our change order #015 to perform the following work at the above
referenced premises for the sum of TWENTY ONE THOUSAND TWO HUNDRED THIRTY FOUR
DOLLARS ($21,234.00);
SCOPE OF WORK
As per Swanke Hayden Connell’s sketch for new sleeve location at 23rd Floor (attached), the following is
our breakdown;
- (41) 4" through-wail sleeves @ $283,38 $11,619.00
- (4) 2" underfloor sleeves @ $141.00 564 00
- 4" stubs from ceiling to below raised floor at 15‘ of conduit
with elbows 15 x 4=60' x $42.29 2,537.00
- Carpenter’s time for cutting, patching and firestopping of wall 3,100.00
- Cutting of raised floor panel 500.00
Subtotal $18,320.00
General Conditions 1,465.00
Overhead & Fee 1,187.00
Insurance 262.00
Total $21,234.00
Please notify us if we are to proceed with this work.
We trust the above meets with your approval and we look forward to the continued pleasure of serving you
Very truly yours,
_Al^A^ADpR CON^UOflON 0Q, INC.
Martin Schneider
Vice President
cc: Juan Mejia - SHC
Glenn Pymento ■ DC AS
Accepted;________ Dated;
c;'«,pcioesk)em(oemco 1S wpaj
317 MADISON avenue, NEW YORK, NY 10017, 212922 1020, FAX2129499762
97X P.02
□CT-08-1998 13=26 212 949 9762
NYC-WTC_000171983
OCR can misread numbers and units. Confirm readings against the page image before using them.