Change order #015 for OEM, 7 World Trade Center, Oct

Machine-extracted title · confidence 95%

Submission of change order #015 by Ambassador Construction Co. to install sleeves and perform firestopping at the Mayor's Office of Emergency Management.

NYC-WTC_000171983–000171984

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #015 Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000171983
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

□CT 08 ’98 13=30 PR RMBfiSSPDOR CONSTR, CD21? 949 9762 TO 6694107 P.02/03

AMBASSADOR CONSTRUCTION CO. INC

October 8, 1998 Mr. Walter Weems Silverstein Properties, Inc, 7 World Trade Center New York, NY 10048

RE; Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23rd Floors Change Order #015 Amb. Job # S57-5175

Dear Mr. Weems;

We are pleased to submit herewith our change order #015 to perform the following work at the above referenced premises for the sum of TWENTY ONE THOUSAND TWO HUNDRED THIRTY FOUR DOLLARS ($21,234.00);

SCOPE OF WORK As per Swanke Hayden Connell’s sketch for new sleeve location at 23rd Floor (attached), the following is our breakdown;

- (41) 4" through-wail sleeves @ $283,38 $11,619.00 - (4) 2" underfloor sleeves @ $141.00 564 00 - 4" stubs from ceiling to below raised floor at 15‘ of conduit with elbows 15 x 4=60' x $42.29 2,537.00 - Carpenter’s time for cutting, patching and firestopping of wall 3,100.00 - Cutting of raised floor panel 500.00 Subtotal $18,320.00 General Conditions 1,465.00 Overhead & Fee 1,187.00 Insurance 262.00 Total $21,234.00

Please notify us if we are to proceed with this work.

We trust the above meets with your approval and we look forward to the continued pleasure of serving you

Very truly yours, _Al^A^ADpR CON^UOflON 0Q, INC.

Martin Schneider Vice President

cc: Juan Mejia - SHC Glenn Pymento ■ DC AS

Accepted;________ Dated; c;'«,pcioesk)em(oemco 1S wpaj

317 MADISON avenue, NEW YORK, NY 10017, 212922 1020, FAX2129499762

97X P.02 □CT-08-1998 13=26 212 949 9762

NYC-WTC_000171983

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171983Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #60 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168513

Memo from Ambassador Construction submitting Change Order #060 for $8,114 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.

2 shared non-person entities · Same agency, volume and box · similarity 0.965

machine-extracted · confidence unavailable · Check page ↗
Change Order #15 sleeves, 7 WTC, Oct 1998 · Box 7DCAS

NYC-WTC_000168650

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

2 shared non-person entities · Same agency, volume and box · similarity 0.958

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168513 · Box 7DCAS

Memo from Ambassador Construction submitting Change Order #060 for $8,114 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.

Similar indexed content

NYC-WTC_000172195 · Box 7DCAS

Submission of change order for power and control wiring installation at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000171766 · Box 7DCAS

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168650 · Box 7DCAS

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

Similar indexed content

NYC-WTC_000171872 · Box 7DCAS

Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →