NYC-WTC_000167887
Architectural drawing excerpt showing plywood panel specifications and structural details.
1 shared topics · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Proposal for change order #2 to install cabinets, countertops, and paneling at the Office of Emergency Management.
NYC-WTC_000171829–000171833Folder label: “Superior Casework Inc. Change Order Proposal”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
NOU 17 16=05 PR AMBASSADOR CONSTR. C0212 949 9762 TO 6694107 P.16/3£ .11/03/193^ 17>41 7105953076 SUPERIOR CASEWORK PAGE 02
UPERIOR ASEWORK INC.
Novembers, 1998
Mr. Martin Schneider Ambassador Construction Co., Inc. 317 Madison Ave. New York. N.Y. 10017
Dear Martin,
Please accept this change order proposal for the construction delivery, and installation of cabinets, countertops, and Architectural Woodwork for The 0ffice of Emergency Management, NYC as per drawing FSK-40 dated 11/2/98. The items included are as follows:
CHANGE ORDER #2
23-11 12 lin. ft. Conan Counter :op
23 sq.ft. Custom Makore Panelinj; ;:
2 lin. ft. Custom Makore Lower YU-
TOTAL including drawings and delivery S 5,775.00* *plus applicable sales tax
TERMS OF PAYMENT:
30% Deposit to Start 30% Upon Delivery 30% After Installation 10% After Completion of Punch L st
79 BRIOO< ST. - BROOKLYN, NY 1 1201 ■ 71 S-68Q-BBQf • FAX7ie'096-9078
LiTM 1 o-j «ncn ,/-. xm 71 BPaCQA'7K PQAP.A? NOU-17-1998 16=00 212 949 9762 98X P. 16 NYC-WTC_000171829
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000167887
Architectural drawing excerpt showing plywood panel specifications and structural details.
1 shared topics · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167912
Floor plan excerpt showing corridor connections and room layouts within the Mayor's suite.
1 shared topics · Same agency, volume and box · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
1 shared non-person entities · Same agency, volume and box · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167882
Transmission of clarification documents and louver shop drawings for construction use.
1 shared topics · Same agency, volume and box · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168456
Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
Same agency, volume and box · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167905
Drawing excerpt indicating the specific location of security cameras in an elevator lobby.
1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167877
Fragment of architectural drawings showing equipment cutout specifications for the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172146
Memo submitting change order #077 for aluminum dam closures and flashing installation at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166828
Technical diagram showing relocated stand pipe and alternative piping routing for emergency management purposes.
Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171872
Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.
1 shared non-person entities · Same agency, volume and box · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167896
Official request from OEM Director for specific construction changes to the Commissioner's Suite.
1 shared non-person entities · Same agency, volume and box · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000167887
Architectural drawing excerpt showing plywood panel specifications and structural details.
Similar indexed content
NYC-WTC_000167912
Floor plan excerpt showing corridor connections and room layouts within the Mayor's suite.
Similar indexed content
NYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
Similar indexed content
NYC-WTC_000167882
Transmission of clarification documents and louver shop drawings for construction use.
Similar indexed content
Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
Similar indexed content