NYC-WTC_000167887
Architectural drawing excerpt showing plywood panel specifications and structural details.
Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Proposal for change order #2 to install cabinets, countertops, and paneling at the Office of Emergency Management.
NYC-WTC_000171829–000171833Folder label: “Superior Casework Inc. Change Order Proposal”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document 11702798 16 : 48 TAT ’ZIZZTWZoe ^1TA?»JWLi U«“\UZIj:‘’ ■VV.-’dTEiirfjj
J/I B D ■■■■HWMII H' r «B I* i- 6 § u.
71 •a - H § 5 ■■■
h S I li I IT" .Z/II I ••■ 11
NOUWB 33S eg n Ii >
s ,1 e oc
d / SI S- e i 11 ; SJ Sg Si I I CM I o •S si h i« § ll^ CM
Ie I? I I
1 w, wS .
I UM_ .01-.2 .O-.C JSIUIIS § oi H -e ft.
79”^ UJ^
ss __ I _ dd Z- =c “ roI CD CM UJ Sil — <c “53 CL, I i > ^S8 -< > E- M i 1 o _ L OlOH CL < I j I lc ..81 Tn cxi © Hi ! i :
I Is: i i i
NYC-WTC_000171830
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000167887
Architectural drawing excerpt showing plywood panel specifications and structural details.
Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167912
Floor plan excerpt showing corridor connections and room layouts within the Mayor's suite.
Same agency, volume and box · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
1 shared non-person entities · Same agency, volume and box · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167882
Transmission of clarification documents and louver shop drawings for construction use.
Same agency, volume and box · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168456
Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167905
Drawing excerpt indicating the specific location of security cameras in an elevator lobby.
Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167877
Fragment of architectural drawings showing equipment cutout specifications for the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172146
Memo submitting change order #077 for aluminum dam closures and flashing installation at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166828
Technical diagram showing relocated stand pipe and alternative piping routing for emergency management purposes.
Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171872
Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.
1 shared non-person entities · Same agency, volume and box · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167896
Official request from OEM Director for specific construction changes to the Commissioner's Suite.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000167948
Document page containing illegible text or graphics related to a project schedule.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172146
Memo submitting change order #077 for aluminum dam closures and flashing installation at the Mayor's Office of Emergency Management.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171007
A one-page document with unreadable text filed under the Measurement Procedure folder.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123194
Invoice for roof asbestos abatement work completed at 198 Broadway covering nearly 25,000 square feet.
Similarity score 0.966 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167910
Fragmented plan view indicating requested additional sleeves for cabling installation.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172240
13-page form document relating to 7 World Trade Center OEM work; content largely illegible.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000167887
Architectural drawing excerpt showing plywood panel specifications and structural details.
Similar indexed content
NYC-WTC_000167912
Floor plan excerpt showing corridor connections and room layouts within the Mayor's suite.
Similar indexed content
NYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
Similar indexed content
NYC-WTC_000167882
Transmission of clarification documents and louver shop drawings for construction use.
Similar indexed content
Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
Similar indexed content