NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #026 Amb. Job # S57-5175
Document / 3 pages

Change Order #26 submission, 7 WTC, Nov 1998

Machine-extracted title · confidence 95%

Letter from Ambassador Construction submitting change order #26 for drywall and electrical patching work at the Mayor's Office of Emergency Management.

NYC-WTC_000171821–000171823

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #026 Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000171823
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NOU 17.’90 10:04 FR AMBfiSSADOR CONStR. C0212 949 9702 TO 0094107 P.10/30

11/04/1930 11:33 5165490039 PRECISION INTERIORS PAGE 02

Precision Interiors Construction Corp. T<rtop»io«»*51S-549-0211 F«xSiS-S<ia-t«38 aORfllroaeSt HunUngten Station, NV 11746

November 4,1998

Ambassador Construction 317 Madison Avenue New York, NY 10017

Attention: Martin Schnleder

Re: Mayor's Office - 7 World Trade Center

PwiIpUqil

REVISION AS PER SKETCH FSK - 37.

CLOSE DR OPENING 1 CONDITION

SCAR PATCH 2 CONDinON

ELECTRICAL OUTLET PATCHES ROOM 2307 $850.00

NOU-17-1998 15:59 212 949 9762 98X P. 10 NYC-WTC_000171823

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171823Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #26R submission, 7 WTC, Dec 1998 · Box 7DCAS

NYC-WTC_000171810

Letter from Ambassador Construction submitting revised change order #26R for repairs at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.974

machine-extracted · confidence unavailable · Check page ↗
Change Order #067 submission, 7 WTC, Feb 1999 · Box 7DCAS

NYC-WTC_000171464

Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #024R submission, Nov 1998 · Box 7DCAS

NYC-WTC_000171914

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168609 · Box 7DCAS

Submission of Change Order #26 for closing door openings and patching drywall and ceilings at 7 World Trade Center.

Filed in the same folder

NYC-WTC_000168605 · Box 7DCAS

Submission of Revised Change Order #26R for drywall closure, scar patching, and ceiling work at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171810 · Box 7DCAS

Letter from Ambassador Construction submitting revised change order #26R for repairs at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000173876 · Box 7DCAS

A memo submits Change Order #26 for $12,599 to close door openings, patch ceilings, and modify electrical systems at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168566 · Box 7DCAS

Ambassador Construction submits Change Order #44 to install fuel oil piping and enclosures at 7 World Trade Center.

Similar indexed content

Compare copies and versions →