NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #026 Amb. Job # S57-5175
Document / 3 pages

Change Order #26 submission, 7 WTC, Nov 1998

Machine-extracted title · confidence 95%

Letter from Ambassador Construction submitting change order #26 for drywall and electrical patching work at the Mayor's Office of Emergency Management.

NYC-WTC_000171821–000171823

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #026 Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000171822
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

■NOU 17. ’98 16=04 FR AMBASSADOR CONSTR. C0212 949 9762 TO 6694107 P.09/36

AMBASSADOR CONSTRUCTION CO, INC.

Mr. Walter Weems November 13, 1998

Page Two...

Woodwork - Furnish and install new cabinets and countertops in room #23-11 ._MZZ5JQ0 Subtotal $10,869.00 General Conditions 870.00 Overhead and Fee 704.00 Insurance ___ _156-.CL0 Total $12,599.00 1,'^: Please notify us if we are to proceed with this work.

We trust the above meets with your approval and we look forward to the continued pleasure of serving you.

Please sign one copy of this letter and return it to our office for our records

If you have any questions, please do not hesitate to contact us.

Very truly yours,

AMBASSADOR CONSTRUCTION CO., INC.

Martin Schnefder Vice President

MS:am cc; Juan Mejia - SHC Glenn Pymento - DCAS

Accepted________ Dated CAWPWIN««MlPOOCSU>€MCeMeOS<I.Wt’D

N0U-17-199S 15=59 212 949 9762 97X p.09

NYC-WTC_000171822

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171822Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #26R submission, 7 WTC, Dec 1998 · Box 7DCAS

NYC-WTC_000171810

Letter from Ambassador Construction submitting revised change order #26R for repairs at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.974

machine-extracted · confidence unavailable · Check page ↗
Change Order #067 submission, 7 WTC, Feb 1999 · Box 7DCAS

NYC-WTC_000171464

Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #024R submission, Nov 1998 · Box 7DCAS

NYC-WTC_000171914

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168609 · Box 7DCAS

Submission of Change Order #26 for closing door openings and patching drywall and ceilings at 7 World Trade Center.

Filed in the same folder

NYC-WTC_000168605 · Box 7DCAS

Submission of Revised Change Order #26R for drywall closure, scar patching, and ceiling work at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171810 · Box 7DCAS

Letter from Ambassador Construction submitting revised change order #26R for repairs at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000173876 · Box 7DCAS

A memo submits Change Order #26 for $12,599 to close door openings, patch ceilings, and modify electrical systems at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168566 · Box 7DCAS

Ambassador Construction submits Change Order #44 to install fuel oil piping and enclosures at 7 World Trade Center.

Similar indexed content

Compare copies and versions →