NYC-WTC_000171840
Letter submitting Change Order #38 for $8,346.00 for unspecified scope of work at the Office of Emergency Management.
Same agency, volume and box · similarity 0.877
machine-extracted · confidence unavailable · Check page ↗Invoice #103528 from Ambassador Construction for plumbing work performed at 7 World Trade Center on floors 1, 7, and 23.
NYC-WTC_000171655Folder label: “None”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
fl PLUMBING CO., INC. 60 North Prospect Avenue LYNBROOK, NEW YQRK 11563 INVOICE (516) 887-4000 FAX (516) 593-9089 NO. 103528 ■ pJffetge 1 Cust. Job #; 5175 Cust. P.O.#! B J 7965 I AMBASSADOR CONSTRUCTION CO. 0 7 WTC L 317 MADISON AVENUE B 1/7/23 C NEW YORK, NY 10017- NEW YORK NY N T 0 0
CUSTOMER NO. PAYMENT TERMS CONTRACT NO ► NVOICE DATE INVOICE NO
12X16/90 103520 AMB1000 NET 30 DAYS
. /.P ■■
■J fc,;7.7^^pEJfSS^'ft .PURCHA^''ORDER^’T^R^THE|F6LLOWIN^YlpW;t5'^^
WcScr:' . (^’bJO# AMBASSADOR' JOB# ■ *\ -vY:/-/ /< .J • J • ■ S 24067 ■■' . / 517^-' U ■■ ■■ .. ;■ ? RELOCATED EXI ST I IMS 1" COPPER COLD WATER MAKE M UPLINE ON ROOF. r<l- . ^ . . . ■
TJ..1 juori-i. 25. 56 579.66
Subtotal 605. £2
Invoice Total 605.22
-fRCVEDFOF^PAYM^ ■7.7^ X , ?:':gQ3:Sn5,,v,-i
NYC-WTC_000171655
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000171840
Letter submitting Change Order #38 for $8,346.00 for unspecified scope of work at the Office of Emergency Management.
Same agency, volume and box · similarity 0.877
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171846
Estimate for furnishing and installing three floor drains at 7 World Trade Center, including overtime costs.
Same agency, volume and box · similarity 0.875
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172707
Estimate from Ambassador Construction Company for furnishing and installing pumps, steel tanks, and hot water heaters at the Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.870
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168478
Memo submitting Change Order #71 for $4,579 to install three-phase fields for circulation pumps at 7 World Trade Center.
Same agency, volume and box · similarity 0.869
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172309
Quote from P&S Industries listing refrigerators, microwaves, and dishwashers for the Mayor's Office at 7 World Trade Center.
Same agency, volume and box · similarity 0.866
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.866
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.865
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.865
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171639
Ambassador Construction submits Change Order #71 to install two 3-phase fields for circulation pumps at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.863
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
1 shared topics · Same agency, volume and box · similarity 0.862
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173079
Fax cover sheet and listing from P&S Industries regarding toilet partitions and accessories dated May 14, 1998.
Same agency, volume and box · similarity 0.860
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000120868
Fax cover letter from The Goldman Properties Company enclosing invoices for work at 33 Rector Street and discussing city compliance.
Similar document embedding; no shared entity or topic indexed. · similarity 0.865
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000166926
Detailed technical specification document for generator procurement intended for the Mayor's Office of Emergency Management.
Filed in the same folder
NYC-WTC_000167197
One-page fax transmission log confirming authorization for scope revisions to the Mayor's Office of Emergency Management project.
Filed in the same folder
Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.
Filed in the same folder
NYC-WTC_000167333
Invoice from architectural firm for Mayor's Office of Emergency Management reimbursable expenses related to World Trade Center project, including consulting and transportation…
Filed in the same folder
NYC-WTC_000167334
Invoice for consulting engineering services for Office of Emergency Management plans and specifications preparation at 7 World Trade Center.
Filed in the same folder