Change Order #38 for unspecified scope, 7 WTC, Dec 1998 · Box 7DCASNYC-WTC_000171840
Change order submitted to DCAS for $8,346.00 for work based on sketches SKP-3 and SKP-4 at the Mayor's Office of Emergency Management at 7 World Trade Center.
Same agency, volume and box · similarity 0.877
Extra work estimate for floor drain installation at 7 WTC, · Box 7DCASNYC-WTC_000171846
Estimate for furnishing and installing three floor drains at 7 World Trade Center, including overtime costs.
Same agency, volume and box · similarity 0.875
Plumbing and tank installation estimate, April 1998 · Box 7DCASNYC-WTC_000172707
Estimate from Ambassador Construction Company for furnishing and installing pumps, steel tanks, and hot water heaters at the Office of Emergency Management.
Same agency, volume and box · similarity 0.870
Change Order #71 for electrical work, 7 WTC, Feb 1999 · Box 7DCASNYC-WTC_000168478
Memo submitting Change Order #71 for $4,579 to install three-phase fields for circulation pumps at 7 World Trade Center.
Same agency, volume and box · similarity 0.869
P&S Industries quote for kitchen appliances, May 1998 · Box 7DCASNYC-WTC_000172309
Quote from P&S Industries listing refrigerators, microwaves, and dishwashers for the Mayor's Office at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.866
Change order #44R proposal for fuel oil lines, March 1999 · Box 7DCASNYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
Same agency, volume and box · similarity 0.866
Revised change order #044R for fuel lines, 7 WTC, March · Box 7DCASNYC-WTC_000171758
Revised change order from Ambassador Construction Company detailing costs and scope for supporting and encasing fuel oil lines at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.865
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
Same agency, volume and box · similarity 0.865
Change Order #71 submission for pump wiring, Feb 1999 · Box 7DCASNYC-WTC_000171639
Ambassador Construction submits Change Order #71 to install two 3-phase fields for circulation pumps at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.863
Fax cover sheet from Ambassador Construction, Nov 1996 · Box 7DCASNYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
Same agency, volume and box · similarity 0.862
P&S Industries toilet accessories estimate fax, May 1998 · Box 7DCASNYC-WTC_000173079
Fax cover sheet and listing from P&S Industries regarding toilet partitions and accessories dated May 14, 1998.
1 shared topics · Same agency, volume and box · similarity 0.860