Change Order #71 submission for pump wiring, Feb 1999

Machine-extracted title · confidence 95%

Ambassador Construction submits Change Order #71 to install two 3-phase fields for circulation pumps at the Mayor's Office of Emergency Management.

NYC-WTC_000171639–000171640

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #071 Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000171639
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document FEB 23 ’99 08••49 PR AMBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.02/02

AMBASSADOR CONSTRUCTION CO., INC,

February 22.1999 Mr. Walter Weems Silverstein Properties, Inc. 7 Worid Trade Center New York, NY 10048

RE: Mayor’s Office of Emergency Management 7 World Trade Center -1. 7 & 23rd Floors Change Order #071 Amb. Job#S57T5175

Dear Mr. Weems:

We are pleased to submit herewith our change order #071 to perform the following work at the above referenced premises for the sum of FOUR THOUSAND FIVE HUNDRED SEVENTY NINE DOLLARS ($4,579.00):

SCOPE OF WORK As per Cosentini Associates sketch FSK-E dated 2/12/99 for the circulation pump wiring we will: • Furnish and install two (2) 3-phase fields at 30amps for circulation pumps. Electrical Work $3,450.00 Mise Patching 500.00 General Conditions 316.00 Overhead and Fee 256.00 Insurance 57 00 Total $4,579.00

Not included in this price is any control wiring

Please notify us if we are to pro'Seed with this work.

If you have any questions please do not hesitate to contact us.

Very truly yours, AMBASSADOR CONDUCTION CO., INC,

Martin Schneider Vice President

MS.am oc; Juan Mejia - SHC Glenn Pymento - DCAS Dated: 31 JQSvf NV 10017 • 212 922 1020 > FAX 212 949 9762

** TOTAL PAGE.02 **

NYC-WTC_000171639

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171639Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #059 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168519

Memo from Ambassador Construction submitting Change Order #059 for $10,948 to install a duplex circuit and drag line on the first floor of 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948

machine-extracted · confidence unavailable · Check page ↗
Change Order #15 sleeves, 7 WTC, Oct 1998 · Box 7DCAS

NYC-WTC_000168650

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168478 · Box 7DCAS

Memo submitting Change Order #71 for $4,579 to install three-phase fields for circulation pumps at 7 World Trade Center.

Filed in the same folder

NYC-WTC_000168519 · Box 7DCAS

Memo from Ambassador Construction submitting Change Order #059 for $10,948 to install a duplex circuit and drag line on the first floor of 7 World Trade Center.

Similar indexed content

NYC-WTC_000168650 · Box 7DCAS

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

Similar indexed content

NYC-WTC_000168529 · Box 7DCAS

Memo submitting Change Order #55 for conduit repairs and electrical work at the loading dock and lobby of 7 World Trade Center.

Similar indexed content

Compare copies and versions →